設為首頁收藏本站

A-Plus互動討論區

 找回密碼
 立即註冊

Login

免註冊即享有會員功能

搜索
熱搜: 活動 交友 discuz
查看: 10|回復: 0
打印 上一主題 下一主題

Cheap NFL Jerseys Store fronted by an earthen dam

[複製鏈接]

3萬

主題

3萬

帖子

10萬

積分

論壇元老

Rank: 8Rank: 8

積分
102747
跳轉到指定樓層
樓主
發表於 2018-3-31 22:17:51 | 只看該作者 回帖獎勵 |倒序瀏覽 |閱讀模式
分享到: 更多
– $80M more for fuel, repairing machinesThe construction of the Hope/DochFour Canal the government is building to help drain water from the East Demerara Water Conservancy (EDWC) is behind schedule, the government said yesterday.Head of the Presidential Secretariat, Dr Roger Luncheon, said that there are delays on specific outputs, but he could not say what those are. The canal is being constructed at a cost of over $3.8 billion.Minister of Agriculture Dr. Leslie Ramsammy,Gordon Hayward Jersey, last December, said that he was concerned that critical aspects of the project may not be completed by the June 2013 deadline.The National Drainage and Irrigation Authority (NDIA) is utilizing its own machinery to dig the canal. On Wednesday, the government approved a further $80 million for fuel and lubricants and to repair and service excavators and other machines.However, for the NDIA to complete its work, it has to wait for the head regulator and the bridge to be completed. In addition, the sluice, which is being built by Contractor Courtney Benn,NFL Jerseys From China, has to be constructed.The NDIA is currently shaping the dam and installing geotextile material in the canal and this is expected to be completed by the June 2013 deadline. BK International is responsible for the construction of the head regulator.  The construction of the Public Road Bridge is the responsibility of DIPCON Engineering Services Ltd.The construction of the High level Outfall Sluice Structure at the Atlantic Ocean end (North of the Hope Secondary School) is the responsibility of Courtney Benn Contracting Services Ltd.The opposition has argued that the construction of the canal is unnecessary since desilting the Mahaica Creek and the four discharges currently used could do the job at times when the EDWC is at a dangerously high level and discharge is necessary.The Conservancy has been a source of grave concern recently, given usual periods of heavy rainfall. When the conservancy,Cheap NFL Jerseys Authentic, which holds water to irrigate farmlands during the dry season, is overwhelmed, it threatens the integrity of the dam, which, if compromised could cause widespread flooding on the heavily populated East Coast Demerara.In recent years, during the rainy season when the water built up in the Conservancy, the government has had cause to ease the water into the Mahaica and Mahaicony Rivers, flooding out the farming communities along the rivers.  Some residents have had to abandon their homes and farmlands and have taken up housing offered by Food for the Poor.The World Bank,China Jersyes Cheap, in 2007, approved what it called The Conservancy Adaptation Project, which overall costs, US$3.8 million.The project aims at strengthening the government’s and donor understanding of the EDWC system and coastal drainage patterns through the integration of advanced mapping and engineering analysis.The project also aims at implementing infrastructure investments to improve drainage performance,Cheap NFL Jerseys, to strengthen the institutional capacity for managing water and floodwater levels, and to guide interventions to reduce Guyana’s vulnerability to floods.The Conservancy system includes a reservoir, fronted by an earthen dam; drainage channels, used to release excess water from the reservoir during the rainy season; and a network of canals,Cheap NBA Jerseys China, used to provide drinking water and irrigation during the dry seasons. Because of this system, farmers are able to realize two harvests of sugar cane and rice annually.The drainage relief structures were created to protect the EDWC dam from overtopping and collapsing during rainy seasons.As the sea level rises, the hydraulic head between the EDWC water control structures and sea outlets is significantly reduced.  The smaller head reduces both the flow rate and discharge window available to discharge excess water from the system.In addition, sea level rise has shortened the discharge window for the coastal plain.  At present, flood control is managed on an emergency basis and control efforts are focused on responding to immediate needs rather than the development of long-term control strategies.This ad-hoc system of flood control is no longer effective and there are limitations on the ability to manage water levels in the coastal plain and prevent flooding and hence the need to better manage the Conservancy.
回復

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

重要聲明:本討論區是以即時上載留言的方式運作,A-Plus補習討論區對所有留言的真實性、完整性及立場等,不負任何法律責任。而一切留言之言論只代表留言者個人意見,並非本網站之立場,讀者及用戶不應信賴內容,並應自行判斷內容之真實性。於有關情形下,讀者及用戶應尋求專業意見(如涉及醫療、法律或投資等問題)。 由於本討論區受到「即時上載留言」運作方式所規限,故不能完全監察所有留言,若讀者及用戶發現有留言出現問題,請聯絡我們。A-Plus補習討論區有權刪除任何留言及拒絕任何人士上載留言(刪除前或不會作事先警告及通知),同時亦有不刪除留言的權利,如有任何爭議,管理員擁有最終的詮釋權。用戶切勿撰寫粗言穢語、誹謗、渲染色情暴力或人身攻擊的言論,敬請自律。本網站保留一切法律權利。

手機版|小黑屋|A-Plus互動討論區    

GMT+8, 2024-5-18 04:58 , Processed in 0.069839 second(s), 26 queries .

Powered by Discuz! X3

© 2001-2013 Comsenz Inc.

快速回復 返回頂部 返回列表