設為首頁收藏本站

A-Plus互動討論區

 找回密碼
 立即註冊

Login

免註冊即享有會員功能

搜索
熱搜: 活動 交友 discuz
查看: 7|回復: 0
打印 上一主題 下一主題

[健身] NFL Jerseys From China based on the 2017 Estimates of the Public Sector

[複製鏈接]

3萬

主題

3萬

帖子

10萬

積分

論壇元老

Rank: 8Rank: 8

積分
102747
跳轉到指定樓層
樓主
發表於 2018-5-11 01:00:14 | 只看該作者 回帖獎勵 |倒序瀏覽 |閱讀模式
分享到: 更多
Government has allocated the sum of $61.7M to carry out repairs to the structurally unsound $1B Kato Secondary School in Region Eight (Potaro/Siparuni).$61.7M has been allocated to repair defective Kato Secondary School.The school was constructed by Kares Engineering Company and was expected to open in January this year, however the project came under intense scrutiny following the discovery of a number of defects.A technical audit was subsequently carried out by a private company and the findings were presented to the National Assembly by Minister of Public Infrastructure David Patterson some months ago.The audit revealed that approximately 60 percent of the project was defective,China Adidas Hockey Jerseys, with another 30 percent just over the borderline. Only 10 percent of the project was deemed structurally sound,Cheap NFL Jerseys China, according to Patterson.Cabinet also examined the report, the roles of the supervising consultant, construction and cost of remedial works to be done. The findings had resulted in cabinet recommending that the Attorney General’s Chambers review the report.“The building of the school at Kato, what those findings revealed (are) nothing short of criminal,China Jerseys Cheap,” the Minister of Natural Resources was quoted in the media as saying.The project is the brainchild of the former administration – the People’s Progressive Party/Civic (PPP/C) and was initially billed at $780M, but the then administration later disclosed that the final tally could be about $1B.The school was intended to be a ‘super structure’, which would cater for 400 students,Cheap NFL Jerseys China, 250 of whom will be accommodated in the dormitory.The 2017 allocation is provided for under a provision of $465.8M under the Ministry of Education’s Capital Secondary Education delivery 2017 work programme. This was according to Junior Minister of Education, Nicolette Henry, during the consideration of her Ministry’s estimates in the National Assembly on Wednesday last.This $465.8M allocation,cheap nfl jerseys, based on the 2017 Estimates of the Public Sector, also includes funds for the completion of the South Ruimveldt Secondary School ground; the extension of The Bishops’ High School; the multi-purpose complex at Queen’s College; and the reconstruction of St. Rose’s High School.During the consideration of the estimates also,NFL Jerseys China, the Minister said that the company had indicated its interest in effecting the needed repairs. She explained that $66 Million was budgeted for the school’s completion in 2016; however, the money was not expended due to the legal issues arising from the defects in the school’s structure.
回復

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

重要聲明:本討論區是以即時上載留言的方式運作,A-Plus補習討論區對所有留言的真實性、完整性及立場等,不負任何法律責任。而一切留言之言論只代表留言者個人意見,並非本網站之立場,讀者及用戶不應信賴內容,並應自行判斷內容之真實性。於有關情形下,讀者及用戶應尋求專業意見(如涉及醫療、法律或投資等問題)。 由於本討論區受到「即時上載留言」運作方式所規限,故不能完全監察所有留言,若讀者及用戶發現有留言出現問題,請聯絡我們。A-Plus補習討論區有權刪除任何留言及拒絕任何人士上載留言(刪除前或不會作事先警告及通知),同時亦有不刪除留言的權利,如有任何爭議,管理員擁有最終的詮釋權。用戶切勿撰寫粗言穢語、誹謗、渲染色情暴力或人身攻擊的言論,敬請自律。本網站保留一切法律權利。

手機版|小黑屋|A-Plus互動討論區    

GMT+8, 2024-5-14 13:16 , Processed in 0.071238 second(s), 28 queries .

Powered by Discuz! X3

© 2001-2013 Comsenz Inc.

快速回復 返回頂部 返回列表