設為首頁收藏本站

A-Plus互動討論區

 找回密碼
 立即註冊

Login

免註冊即享有會員功能

搜索
熱搜: 活動 交友 discuz
查看: 23|回復: 0
打印 上一主題 下一主題

Wholesale Jerseys China Micah Williams

[複製鏈接]

3萬

主題

3萬

帖子

10萬

積分

論壇元老

Rank: 8Rank: 8

積分
102747
跳轉到指定樓層
樓主
發表於 2017-2-16 13:28:04 | 只看該作者 回帖獎勵 |倒序瀏覽 |閱讀模式
分享到: 更多
Residents of the Bartica/Potaro  Road from One  to Five  Miles  are  disheartened  by  the  lackadaisical  approach  now  being  adopted  by  the  assigned  personnel  who are  effecting  the necessary  resurfacing works to  the thoroughfare. They are lagging by schedule.Since September 7 ,jerseys from china, last,cheap jerseys,  after a  Memorandum  of  Understanding  was  signed between  the Region Seven  Administration and  the  delegation  of  residents and commuters,  only crusher  run  materials  have  been  dumped  at  certain strategic  areas  on  the  thoroughfare.The Bartica road remains untouched despite assurances of immediate road repairs.A  drain was also dug  between  the  One  to Five Miles  area ,cheap jerseys from china, but  for  the  past  week  no  more  works  have been done.Bartica residents,wholesale nfl jerseys, including bus operators, had protested the state of the road, forcing the administration to address the matter with some urgency.However, there appears to be a lull in activity much to the disappointment of the residents.Spokesperson for the delegation of residents,nfl jerseys china, Micah Williams,wholesale jerseys, told this newspaper that he is being bombarded by residents who are concerned that the works appear to be halted despite the commitment given by the regional administration.Williams  also  said  that,cheap nfl jerseys,  to date , no  copy  of the  road  resurfacing  works  contract  has  been  given  to  the  group ,jerseys cheap nfl, and despite an assurance,cheap nfl jerseys elite, no  machinery  is  on  site  to disperse  the  crusher  run materials  that  was dumped  on the thoroughfare some  10 days  ago.He  added that if  the  situation  continues, he  would  be  seeking to  meet  with  the Region  Seven  officials  to  discuss   ways of  pushing ahead  with  the  road  works  by  Friday  of  this  week.If no deal is reached, there is the likelihood that the protest actions will resume.Commuters  and  residents  who are directly affected  by the current state of the road are all anxiously  awaiting  the moment  when  they  can  enjoy  full  use  of  a  commercially  durable One  to  Five  Miles  Road.  (Edward A. Persaud).
回復

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

重要聲明:本討論區是以即時上載留言的方式運作,A-Plus補習討論區對所有留言的真實性、完整性及立場等,不負任何法律責任。而一切留言之言論只代表留言者個人意見,並非本網站之立場,讀者及用戶不應信賴內容,並應自行判斷內容之真實性。於有關情形下,讀者及用戶應尋求專業意見(如涉及醫療、法律或投資等問題)。 由於本討論區受到「即時上載留言」運作方式所規限,故不能完全監察所有留言,若讀者及用戶發現有留言出現問題,請聯絡我們。A-Plus補習討論區有權刪除任何留言及拒絕任何人士上載留言(刪除前或不會作事先警告及通知),同時亦有不刪除留言的權利,如有任何爭議,管理員擁有最終的詮釋權。用戶切勿撰寫粗言穢語、誹謗、渲染色情暴力或人身攻擊的言論,敬請自律。本網站保留一切法律權利。

手機版|小黑屋|A-Plus互動討論區    

GMT+8, 2024-5-21 12:40 , Processed in 0.072390 second(s), 28 queries .

Powered by Discuz! X3

© 2001-2013 Comsenz Inc.

快速回復 返回頂部 返回列表