設為首頁收藏本站

A-Plus互動討論區

 找回密碼
 立即註冊

Login

免註冊即享有會員功能

搜索
熱搜: 活動 交友 discuz
查看: 6|回復: 0
打印 上一主題 下一主題

[泰拳] L.C. Greenwood Steelers Jersey sog3a11l

[複製鏈接]

3萬

主題

3萬

帖子

10萬

積分

論壇元老

Rank: 8Rank: 8

積分
102747
跳轉到指定樓層
樓主
發表於 2017-3-30 20:51:41 | 只看該作者 回帖獎勵 |倒序瀏覽 |閱讀模式
分享到: 更多
– Tendering process for construction to commence in late FebruaryThe design for the billion-dollar Hope/Doch Four Canal has been finalized and the tendering process for its construction is expected to start in the latter part of February.Agriculture Minister, Robert Persaud made this announcement yesterday at his Ministry. The Minister said the consultative period was undertaken subsequent to the preliminary design being presented to the Guyana Association for Professional Engineers for the $3B project for their perusal and expert opinion.He stated that a thorough study of the design was done by the body and the design was then made available on the website where feedback was received,Brendan Shanahan Red Wings Jersey, leading to improvements being made to the draft and its finalization.“We expect that in the last week of February we will commence in terms of going out through public advertisement,Tom Barrasso Penguins Jersey, inviting tenders for the structures.“We will soon be commencing test work on a section of that dam in another three weeks’ time. We are about to procure the material, we have just purchased a new excavator which will be deployed so that we can look at a test area before we commence the full dam work,Alex Galchenyuk Canadiens Jersey,” Minister Persaud revealed.The draft design,Curtis Joseph Red Wings Jersey, which was completed last December,Mike Richter Rangers Jersey, proposed two options,Marc Staal Rangers Jersey, the first is for a shallow outfall channel with a high crested weir (fall), and is preferred by engineers.This design boasts a one kilometre long outfall to the Atlantic Ocean with a discharge capacity of 62.1 cubic metres per second. The cost for the construction of that design is $3.6B.The second option comprises a deep outfall channel with a low invert sluice and among its features is a low level reinforced concrete outfall sluice with a discharge capacity of 66 cubic metres per second. This design costs $3.2B.However,Andrei Markov Canadiens Jersey, the engineering team is not inclined to go with the latter design since periodic dredging of the channel will be needed,Guy Lapointe Canadiens Jersey, thereby incurring additional cost.The building of the canal, which will be completed within a three-year period,Henrik Zetterberg Red Wings Jersey, was necessitated due to the constant flooding of the Mahaica/Mahaicony areas during the rainy seasons.This situation is further exacerbated by the release of water from the East Demerara Water Conservancy whenever it reaches dangerously high levels.However with the construction of the new canal, the flooding situation in these areas is expected to cease as the excess water from the conservancy will be released into the new canal.
回復

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

重要聲明:本討論區是以即時上載留言的方式運作,A-Plus補習討論區對所有留言的真實性、完整性及立場等,不負任何法律責任。而一切留言之言論只代表留言者個人意見,並非本網站之立場,讀者及用戶不應信賴內容,並應自行判斷內容之真實性。於有關情形下,讀者及用戶應尋求專業意見(如涉及醫療、法律或投資等問題)。 由於本討論區受到「即時上載留言」運作方式所規限,故不能完全監察所有留言,若讀者及用戶發現有留言出現問題,請聯絡我們。A-Plus補習討論區有權刪除任何留言及拒絕任何人士上載留言(刪除前或不會作事先警告及通知),同時亦有不刪除留言的權利,如有任何爭議,管理員擁有最終的詮釋權。用戶切勿撰寫粗言穢語、誹謗、渲染色情暴力或人身攻擊的言論,敬請自律。本網站保留一切法律權利。

手機版|小黑屋|A-Plus互動討論區    

GMT+8, 2024-5-14 22:01 , Processed in 0.051528 second(s), 28 queries .

Powered by Discuz! X3

© 2001-2013 Comsenz Inc.

快速回復 返回頂部 返回列表