設為首頁收藏本站

A-Plus互動討論區

 找回密碼
 立即註冊

Login

免註冊即享有會員功能

搜索
熱搜: 活動 交友 discuz
查看: 11|回復: 0
打印 上一主題 下一主題

Ray Nitschke Packers Jersey ytbxb0qn

[複製鏈接]

3萬

主題

3萬

帖子

10萬

積分

論壇元老

Rank: 8Rank: 8

積分
102747
跳轉到指定樓層
樓主
發表於 2017-4-26 04:20:42 | 只看該作者 回帖獎勵 |倒序瀏覽 |閱讀模式
分享到: 更多
Cabinet Secretary Dr. Roger Luncheon has said that Government has been experiencing some amount of difficulty with the LTE Fiber Optic Cable programme.According to Dr Luncheon, the cable is already in Georgetown,Mike Gartner Rangers Jersey, but the lots which are about five sectors have to be connected.He explained that the continuity of the project will have to be determined by the transmission of signals from the point of origin in Lethem all the way to Castellani House compound.Dr Luncheon noted that defects in the programme are mainly because of the ‘up and down’ terrain. “It’s a bit of a difficulty and the five contractors have been going back to correct defects in the works,” Luncheon told the media.He said that until that portion is completed the connection between sections will not be done. “One has to be satisfied that the cable has been placed properly and buried at the proper depth,” he added.The project,Tie Domi Rangers Jersey, which commenced at the start of last year,Mario Lemieux Penguins Jersey, is intended to boost the government’s ability to carry out its “e-governance” strategy.The 560-kilometre cable was laid in six blocks– from Lethem to Annai, from Annai to Kurupukari,Dominic Moore Rangers Jersey, from Kurupukari to Mabura, from Mabura to Wisroc,Ken Dryden Canadiens Jersey, from Wisroc to Providence and then from Providence to Georgetown.Five repeater stations need to be constructed with the most advanced one being based in Linden. The cable was laid in 10-kilometre stretches, and as a result, connecting “joint boxes” where the splicing will be done, also had to be constructed at 10-kilometre intervals.The project is part of the government’s plan to improve internet access in Guyana and would have a direct impact on the One Laptop Per family Project through which the government hopes to provide free internet access to all communities across the country.The laying of the cable was done by MMC,Ryan Callahan Lightning Jersey, Dax Contracting and Dynamic Engineering,Nikita Kucherov Lightning Jersey, which were responsible for burying cables along the route. They used Guyana Power and Light (GPL) poles to suspend the cables where necessary.The design of the project was carried out by E-Networks (Guyana), Huawei (China) and Oi (Brazil). The project came shortly after GT&T landed a US$60M fibre optic cable from Suriname.Dr Luncheon also disclosed that some 15,000 laptops from the One Laptop Per Family project has been distributed. According to Luncheon another 10,000 are on the verge of being distributed and that would be considered phase one.He stated that through the support which has been provided by the Chinese Government,Adam Graves Rangers Jersey, Guyana will be accessing another 30,Bob Probert Red Wings Jersey,000 laptops. Dr Luncheon said that would take the programme into phase two “which take us well into 2013.”Government has set 2015 as the target when every Guyanese becomes versed in the use of the computer and will complement this plan with the roll out of the OLPF where 90,000 families receive one laptop free of cost.The project “One Laptop Per Family (OLPF)”  aims to gear Guyana’s development path on an Information Technology.
回復

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

重要聲明:本討論區是以即時上載留言的方式運作,A-Plus補習討論區對所有留言的真實性、完整性及立場等,不負任何法律責任。而一切留言之言論只代表留言者個人意見,並非本網站之立場,讀者及用戶不應信賴內容,並應自行判斷內容之真實性。於有關情形下,讀者及用戶應尋求專業意見(如涉及醫療、法律或投資等問題)。 由於本討論區受到「即時上載留言」運作方式所規限,故不能完全監察所有留言,若讀者及用戶發現有留言出現問題,請聯絡我們。A-Plus補習討論區有權刪除任何留言及拒絕任何人士上載留言(刪除前或不會作事先警告及通知),同時亦有不刪除留言的權利,如有任何爭議,管理員擁有最終的詮釋權。用戶切勿撰寫粗言穢語、誹謗、渲染色情暴力或人身攻擊的言論,敬請自律。本網站保留一切法律權利。

手機版|小黑屋|A-Plus互動討論區    

GMT+8, 2024-5-20 07:17 , Processed in 0.070696 second(s), 26 queries .

Powered by Discuz! X3

© 2001-2013 Comsenz Inc.

快速回復 返回頂部 返回列表