設為首頁收藏本站

A-Plus互動討論區

 找回密碼
 立即註冊

Login

免註冊即享有會員功能

搜索
熱搜: 活動 交友 discuz
查看: 3|回復: 0
打印 上一主題 下一主題

[泰拳] Steve Grogan Patriots Jersey o24thzjr

[複製鏈接]

3萬

主題

3萬

帖子

10萬

積分

論壇元老

Rank: 8Rank: 8

積分
102747
跳轉到指定樓層
樓主
發表於 2017-5-6 18:44:03 | 只看該作者 回帖獎勵 |倒序瀏覽 |閱讀模式
分享到: 更多
–  Caribbean Airline crashApproximately 300 houses belonging to squatters, especially on the northern section of the Cheddi Jagan International Airport (CJIA) are pending removal in the wake of the Caribbean Airlines Limited aircraft flight BW523 crash Saturday last.This was announced by CJIA Chief Executive Officer, Ramesh Ghir at a press conference at the airport yesterday.Head of the Presidential Secretariat Dr Roger Luncheon had also recently noted that the most preliminary observation about interventions at the airport suggests that aggressive action is needed to remove the squatters who are directly in the path of the extended runway.One of the engines being dismantled yesterday.However, Ghir said that a meeting is being planned this coming week to definitively address the squatting situation at the country’s only international airport.He said, previously,Ryan Nugent-Hopkins Team North America Jersey, meetings were held with the squatters and they were told of the safety and security risks they face while squatting around the perimeter of the airport.Meanwhile, investigations are continuing into the cause of the crash and Ghir noted that the engines of the US$38M aircraft are being removed along with other parts of the plane.These parts will eventually be handed over to Caribbean Airlines.Beyond the acknowledgement that the plane overran the runway, there is not much that the government is saying, as the local Civil Aviation Authority is working with regional and international experts to determine what went wrong.Initial Report and ResponseAccording to the airport’s Chief Executive Officer, the established procedures were used after the aircraft ran off the runway.Since 2004 there were seven simulated emergency exercises which were carried out at the CJIA to cater for such eventualities.In disclosing the report of activities and responses by CJIAC and related agencies immediately following the accident,Travis Moen Jersey, Ghir said that on 30th July 2011, the flight originated from JFK International Airport, and in-transited in Port of Spain,Charlie Coyle Jersey, onwards to the CJIA.Onboard were 154 passengers, including one infant and six crew members.The aircraft overshot the runway and crashed after it landed causing severe damage, and injury to some of the passengers.Ghir said that at 01:33 hours, the Air Traffic Controller (ATC) informed the Airport Duty Officer (ADO) that the BW523 had landed and gone over the end of Runway 06.“On receipt of the call from the Control Tower,Matt Dumba Jersey, the ADO activated the emergency plan by calling the Chief Executive Officer at 1:34 hrs; Deputy Manager Airport Operations at 1:34 (No Answer); Senior Aerodrome Officer at 1:35; Deputy Manager Airport Operations    at 1:36hrs; GDF Ops at 1:37 (No Answer); Timehri Police at 1:37 (Already Informed); Port Health at 1:38 (Already Informed); GPHC at 1:39 (No Answer);Immigration at 1:40 hrs; Customs at 1:40 hrs; CAL at 1:41(Already Informed),” Ghir explained.Underscoring that concurrently, the Air Traffic Controller placed calls to Aerodrome Fire Service; Rescue Coordination Centre and the Aircraft Operator,David Clarkson Jersey, Ghir said that these calls were made in accordance with the established procedures in the Airport Emergency Plan.He said that after being advised of the accident by Air Traffic Control,Seth Jones Team North America Jersey, Aerodrome Fire Service responded to the crash site within three minutes with three fire tenders at the end of Runway 06, providing lighting to the accident scene and to respond to any possible fire.Upon observing the passengers exiting the aircraft via the wings and emergency chute,Chris Chelios Jersey, some fire officers made their way down the 20ft slope and rendered assistance to the passengers.“The Aerodrome Fire Service Station Officer explained that the left engine was smoking and they sprayed foam on it to prevent a fire. Also assisting passengers at this time were Red Caps and Airport Ramp Attendants who had previously been trained in emergency response exercises. The aircraft was cleared of all passengers by 01:38 hours except for the Captain and First Officer who later deplaned with assistance from the Aerodrome Fire Service,” Ghir said.Ghir noted that himself along with Minister Robeson Benn arrived at the crash site at 02:15 hrs and was briefed by the Senior Aerodrome Officer. At this time there were no passengers at the crash site except for the Flight Crew. In addition, at 02:25 President Jagdeo arrived at the Terminal Building and met with passengers.Medical Services and Care RenderedUnderscoring that an established Care Area at 02:15 in the Arrival Immigration Area (Port Health Office) was available, Ghir said approximately 31 persons were attended to at this facility with most of the passengers suffering from shock and minor injuries. There were about four passengers who suffered serious injuries to their limbs. They were subsequently transported to and admitted in hospital.In addition,Scott Hartnell Jersey, four doctors along with three ambulances arrived at the airport at approximately 03:00 hrs and immediately assisted the remaining passengers.He said senior government officials present at the scene included the Minister of Transport and Hydraulics, Chief of Staff,Jamie Benn Jersey, Commodore Gary Best and his senior officers, Commissioner of Police Henry Greene and his senior officers, Chairman and other senior officers of CJIA, Director General and Senior Officers of GCAA and representatives of the Civil Defense Commission.However, following a meeting, a decision was taken to conduct a detailed inspection and assessment at first light to determine when the airport will be reopened and what restrictions will apply, given that the tail of the aircraft was creating an obstruction along the flight path.He said that during the closure of Runway 06/24, Runway 11/29 was used to process light Aircraft such as the Dash-8 and smaller. Landing and take-offs were done using this runway. Runway 06/24 was re-opened at 11:30 hours on Saturday 30th after notice was given that the operational length of the runway was being reduced to 7,000 feet.Commenting on taxi drivers taking money from persons who were being rescued from the crash, Ghir said an internal investigation is to be carried on breaches of any regulation at the airport and sanctions will be implemented  accordingly. However, at present one taxi driver has been suspended indefinitely.
回復

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

重要聲明:本討論區是以即時上載留言的方式運作,A-Plus補習討論區對所有留言的真實性、完整性及立場等,不負任何法律責任。而一切留言之言論只代表留言者個人意見,並非本網站之立場,讀者及用戶不應信賴內容,並應自行判斷內容之真實性。於有關情形下,讀者及用戶應尋求專業意見(如涉及醫療、法律或投資等問題)。 由於本討論區受到「即時上載留言」運作方式所規限,故不能完全監察所有留言,若讀者及用戶發現有留言出現問題,請聯絡我們。A-Plus補習討論區有權刪除任何留言及拒絕任何人士上載留言(刪除前或不會作事先警告及通知),同時亦有不刪除留言的權利,如有任何爭議,管理員擁有最終的詮釋權。用戶切勿撰寫粗言穢語、誹謗、渲染色情暴力或人身攻擊的言論,敬請自律。本網站保留一切法律權利。

手機版|小黑屋|A-Plus互動討論區    

GMT+8, 2024-5-8 10:55 , Processed in 0.069537 second(s), 28 queries .

Powered by Discuz! X3

© 2001-2013 Comsenz Inc.

快速回復 返回頂部 返回列表