設為首頁收藏本站

A-Plus互動討論區

 找回密碼
 立即註冊

Login

免註冊即享有會員功能

搜索
熱搜: 活動 交友 discuz
查看: 12|回復: 0
打印 上一主題 下一主題

Jerseys China Wholesale East Bank Demerara

[複製鏈接]

3萬

主題

3萬

帖子

10萬

積分

論壇元老

Rank: 8Rank: 8

積分
102747
跳轉到指定樓層
樓主
發表於 2017-5-9 06:47:05 | 只看該作者 回帖獎勵 |倒序瀏覽 |閱讀模式
分享到: 更多
The Ministry of Public Infrastructure has invited fresh Expressions of Interest (EoI) from local and foreign consultants in order to complete a feasibility study and design for a new bridge across the Demerara River.The current Demerara Harbour Bridge structure, with the mammoth traffic jam.This study, not exceeding 36 weeks, will seek to enhance the old pre-feasibility proposals, which lacked several components and was described by the current administration as having incomplete documentation.The new EoIs are to be delivered to The Chairman,NFL Jerseys Outlet From China, National Procurement and Tender Administration Board by Tuesday, December 1, 2015.The present Demerara Harbour Bridge (DHB) structure crosses the Demerara River four miles (6.4 km) south of Georgetown from Peter’s Hall, East Bank Demerara (EBD) to Schoonord, West Bank Demerara (WBD).It is a vital link between the EBD and Georgetown,NFL Jerseys Outlet, especially in light of the many housing developments springing up along the WBD prompted by the amount of land and the prices available. However, regular traffic congestion has caused much frustration to road users who sometimes suffer hour-long delays.The new project framework, as set out by the Ministry in its request for EOI, will examine the three possible sites for the new bridge, namely Houston, EBD to Versailles WBD or New Hope EBD to Laurentia Catherina, WBD or a site close to the existing bridge structure.In keeping with the Ministry of Public Infrastructure’s mandate, any proposed bridge design will include a navigational clearance of 100 meters wide with navigational aids, an air draft of 50 meters of vertical clearance,Authentic NFL Jerseys Wholesale China, adequate marine collision protection at navigating channels, and an estimated length of 2,NFL Jerseys Supply,250 meters.A pre-feasibility study was once done by the then Ministry of Public Works, in collaboration with Raymond Charles in 2013. That study examined the cost and the benefit of the three sites.It also analyzed the other alternative of keeping the old bridge and investing in maintenance, rehabilitation and replacement of the existing two lane floating bridge-which is 37 years old- versus a new four lane floating bridge. It also examined a new four lane fixed structure bridge.The final report of the pre-feasibility study was released in October 2013 by then Minister of Public Works and Hydraulics, Robeson Benn.  According to the report, a new high-level,Jerseys NFL Wholesale China, four-lane fixed- bridge structure at Houston, Greater Georgetown, to Versailles on the West Bank of Demerara, was determined to be the only economically feasible alternative. The document also estimated the cost at some US$264M.However, the new administration has since blasted the way the pre-feasibility study was conducted by the previous administration. Minister of Public Infrastructure David Patterson has described the study as “ad hoc”,Jerseys NFL Wholesale China Online, and lacking basic components such as soil tests and tidal flows.The Ministry is now aiming to conduct a more in-depth study that incorporates those components as well as preliminary designs of proposed bridge structures, approach roads, impact and desirable considerations which were not covered in the 2013 study.The new study is also expected to include an economic analysis detailing external costs and benefits, a financial analysis that addresses the concerns of how the project will be financed and a detailed Environmental and Social Impact Assessment (ESIA).The existing two-lane floating bridge was constructed in 1978 by the UK firm Thomas Storey Engineers Limited. It had an initial life of 20 years. From 1995 to 1998 the bridge underwent major rehabilitation by the Damien Ship Yards of the Netherlands at a cost of US$9M and was given an extended life of 15 years (from 1995).At present the Demerara Harbour Bridge Corporation (DHBC) carries out intensive annual maintenance and element replacement activities on the bridge structure.The DHBC is responsible for the management and collection of tolls. The average annual revenue collection is approximately US$1.9M.
回復

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

重要聲明:本討論區是以即時上載留言的方式運作,A-Plus補習討論區對所有留言的真實性、完整性及立場等,不負任何法律責任。而一切留言之言論只代表留言者個人意見,並非本網站之立場,讀者及用戶不應信賴內容,並應自行判斷內容之真實性。於有關情形下,讀者及用戶應尋求專業意見(如涉及醫療、法律或投資等問題)。 由於本討論區受到「即時上載留言」運作方式所規限,故不能完全監察所有留言,若讀者及用戶發現有留言出現問題,請聯絡我們。A-Plus補習討論區有權刪除任何留言及拒絕任何人士上載留言(刪除前或不會作事先警告及通知),同時亦有不刪除留言的權利,如有任何爭議,管理員擁有最終的詮釋權。用戶切勿撰寫粗言穢語、誹謗、渲染色情暴力或人身攻擊的言論,敬請自律。本網站保留一切法律權利。

手機版|小黑屋|A-Plus互動討論區    

GMT+8, 2024-5-19 12:52 , Processed in 0.069492 second(s), 26 queries .

Powered by Discuz! X3

© 2001-2013 Comsenz Inc.

快速回復 返回頂部 返回列表