Bridges Engineer

[複製鏈接]

3萬

主題

3萬

帖子

9萬

積分

論壇元老

Rank: 8Rank: 8

積分
95416
發表於 2017-5-13 06:27:14 | 顯示全部樓層 |閱讀模式
分享到: 更多
The $380M expansion of the Ogle International Airport is said to be 96 percent completed. The project is expected to conclude by its extended November 15 deadline. When completed, the runway will accommodate more international flights including the Liat Airlines.This is according to Sunil Ganesh, Bridges Engineer, Ministry of Public Works and Communications. He revealed that the contractor, BK International, has completed casting all concrete slabs while minor works including sealing of the joints, grading of the shoulders and marking of the airstrip remain.The scope of the project includes the expansions of the runway in the western direction by 2,000ft and 100ft in width; by 40ft in the northern and southern directions; and the length of the runway in the eastern direction will be increased by 200ft. The new dimension of the runway will be 4,200ft in length and 100ft in width.Ganesh emphasised that the project commenced in August 2009 and was scheduled to be concluded within 18 months. The contractor was unable to meet that deadline and is reportedly currently paying liquidated damages to the Ministry.
回復

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

重要聲明:本討論區是以即時上載留言的方式運作,A-Plus補習討論區對所有留言的真實性、完整性及立場等,不負任何法律責任。而一切留言之言論只代表留言者個人意見,並非本網站之立場,讀者及用戶不應信賴內容,並應自行判斷內容之真實性。於有關情形下,讀者及用戶應尋求專業意見(如涉及醫療、法律或投資等問題)。 由於本討論區受到「即時上載留言」運作方式所規限,故不能完全監察所有留言,若讀者及用戶發現有留言出現問題,請聯絡我們。A-Plus補習討論區有權刪除任何留言及拒絕任何人士上載留言(刪除前或不會作事先警告及通知),同時亦有不刪除留言的權利,如有任何爭議,管理員擁有最終的詮釋權。用戶切勿撰寫粗言穢語、誹謗、渲染色情暴力或人身攻擊的言論,敬請自律。本網站保留一切法律權利。

手機版|小黑屋|A-Plus互動討論區    

GMT+8, 2024-4-17 00:28 , Processed in 0.085823 second(s), 25 queries .

Powered by Discuz! X3

© 2001-2013 Comsenz Inc.

快速回復 返回頂部 返回列表