設為首頁收藏本站

A-Plus互動討論區

 找回密碼
 立即註冊

Login

免註冊即享有會員功能

搜索
熱搜: 活動 交友 discuz
查看: 9|回復: 0
打印 上一主題 下一主題

[足球] Cheap Jerseys Free u04blgmz

[複製鏈接]

2958

主題

2958

帖子

9276

積分

論壇元老

Rank: 8Rank: 8

積分
9276
跳轉到指定樓層
樓主
發表於 2017-5-22 03:12:15 | 只看該作者 回帖獎勵 |倒序瀏覽 |閱讀模式
分享到: 更多
There seems to be more hiccups with the East Coast Demerara Public Road four-lane expansion project,Cheap Jerseys From China, with another contractor carrying out poor quality works.A reliable source told Kaieteur News that the section of the road under contention is from Mon Repos to De Endragt, and is being executed by Colin Talbot.According to the source,Cheap Jerseys Free Shipping, on Monday representatives of the Public Works Ministry in the presence of the contractor tested the strength of the concrete and it failed.“Yesterday (Monday) the Ministry did a compaction test and found that in the 28 days the concrete was way below half of the required strength,” the source said.The source also noted that the same concrete was used to erect drains and sections of the road. The structures are now failing, due to heavy-duty machinery that is transporting building materials for residents.According to the source,Cheap Jerseys, previously the contractor only wanted to carry out works during the nights, which made it difficult for personnel from the Ministry to inspect. “The poor quality works being executed was possibly the reason why the contractor wanted to work at nights,China Jerseys Online,” the source said.Another worrying matter with this aspect of the expansion project is its possible inability to conclude by the March deadline. The project is only 65 percent completed and Government has awarded another contract to the contractor.The source said that the contractor is now required to construct from De Endragt to Good Hope. It was noted this new section has not been identified by a Lot and costs about $300M.In 2012,Jerseys NFL Wholesale, the expansion project in Lot One,Cheap Jerseys NFL, from Better Hope to Montrose, experienced controversy with the termination of the contract to Falcon Transport and Construction Services. The contractor had claimed that his refusal to offer kickback and gifts cost him the contract.The company claimed that Ministry of Public Works officials as well as a ‘Big Man’ from the Ministry of Finance had made demands for kickbacks from the $468M contract.The Ministry subsequently claimed that the contractor executed poor quality works and accused him of committing forgery. Public Works Minister Robeson Benn was adamant that fraudulent submissions and non-performance should have been the focus.He had related that in April, a site visit showed numerous defects to the project and the contractor was asked to make corrections, but they were never done. But the fraudulent submissions of concrete-testing results and purchase and provision of steel were the main bones of contention.
回復

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

重要聲明:本討論區是以即時上載留言的方式運作,A-Plus補習討論區對所有留言的真實性、完整性及立場等,不負任何法律責任。而一切留言之言論只代表留言者個人意見,並非本網站之立場,讀者及用戶不應信賴內容,並應自行判斷內容之真實性。於有關情形下,讀者及用戶應尋求專業意見(如涉及醫療、法律或投資等問題)。 由於本討論區受到「即時上載留言」運作方式所規限,故不能完全監察所有留言,若讀者及用戶發現有留言出現問題,請聯絡我們。A-Plus補習討論區有權刪除任何留言及拒絕任何人士上載留言(刪除前或不會作事先警告及通知),同時亦有不刪除留言的權利,如有任何爭議,管理員擁有最終的詮釋權。用戶切勿撰寫粗言穢語、誹謗、渲染色情暴力或人身攻擊的言論,敬請自律。本網站保留一切法律權利。

手機版|小黑屋|A-Plus互動討論區    

GMT+8, 2024-5-2 07:54 , Processed in 0.076266 second(s), 28 queries .

Powered by Discuz! X3

© 2001-2013 Comsenz Inc.

快速回復 返回頂部 返回列表