設為首頁收藏本站

A-Plus互動討論區

 找回密碼
 立即註冊

Login

免註冊即享有會員功能

搜索
熱搜: 活動 交友 discuz
查看: 5|回復: 0
打印 上一主題 下一主題

Cheap Jerseys NFL kv04oqne

[複製鏈接]

2958

主題

2958

帖子

9276

積分

論壇元老

Rank: 8Rank: 8

積分
9276
跳轉到指定樓層
樓主
發表於 2017-5-29 03:44:39 | 只看該作者 回帖獎勵 |倒序瀏覽 |閱讀模式
分享到: 更多
By Leonard GildarieA $5.3B budget cut, earlier this year, to funding for the expansion of the Cheddi Jagan International Airport (CJIA),NFL Jerseys Authentic Cheap, has resulted in a delay of construction works. The Government and the contractor,David Njoku Jersey, China Harbour Engineering Company Limited (CHEC), had been targeting a June start.CJIA’s Chief Executive Officer, Ramesh Ghir, on Wednesday confirmed that works were “not necessarily at the place” where stakeholders involved in the project would like it to be.CHEC is already here, with the design phase now being worked on, as uncertainty remains when and if the monies will be released this year.With the $5.3B withheld by the National Assembly, Airport management would be more than worried and more than cautious as there is a contract in place and a deadline.Under the project, a new, modern terminal building would be constructed with the runway extended to accommodate larger, wide-body planes.Government has signed a design and build contract to the tune of US$138M with the Chinese contractor. The project is being partially funded by a US$130M loan from China with the rest coming from the public treasury.Under the contract, CHEC has 32 months to complete the project. This month, the contractor had expected to start backfilling the area for the runway extension with sand. This phase has now been pushed back to September or October.Already, some US$20.7M ($4.1B),NFL Jerseys China Wholesale, representing advances for mobilization,Wholesale Jerseys China, has been handed over to CHEC for the project. The required soil testing has been conducted.The budget cut, CJIA officials said in April, had placed the expansion project in limbo. The Opposition parties, in effecting the budget cut, argued that the government has been less than transparent on the expansion plan. They wanted more information, justifying why that amount should be spent at this time when Guyana does not even have enough airlines landing here., Chairman of the Board of Directors of CJIA,Cheap Jerseys Free Shipping, Ramesh Dookhoo, had hinted that it would be very difficult to recover the US$20.7M, since the contractor had already commenced work on the project.He also noted that there would have to be possible compensation to the contractor if the design and build contract has to be cancelled as a result of the budget cuts. Guyana could also be liable to the financing institution, China Export/Import Bank, should there be a cancellation of the loan agreement.The Opposition has been questioning the feasibility of spending that much money on what would be, up to this time, Guyana’s second largest project.Government, in justification of the venture, said the airport is limited in term of space, with severe constraints and not enough check-in booths, especially in the peak season.Additionally, Dookhoo had said there was inadequate space on the international apron, forcing aircraft to park on the taxiway,Wholesale Jerseys, which is contrary to airport regulations.
回復

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

重要聲明:本討論區是以即時上載留言的方式運作,A-Plus補習討論區對所有留言的真實性、完整性及立場等,不負任何法律責任。而一切留言之言論只代表留言者個人意見,並非本網站之立場,讀者及用戶不應信賴內容,並應自行判斷內容之真實性。於有關情形下,讀者及用戶應尋求專業意見(如涉及醫療、法律或投資等問題)。 由於本討論區受到「即時上載留言」運作方式所規限,故不能完全監察所有留言,若讀者及用戶發現有留言出現問題,請聯絡我們。A-Plus補習討論區有權刪除任何留言及拒絕任何人士上載留言(刪除前或不會作事先警告及通知),同時亦有不刪除留言的權利,如有任何爭議,管理員擁有最終的詮釋權。用戶切勿撰寫粗言穢語、誹謗、渲染色情暴力或人身攻擊的言論,敬請自律。本網站保留一切法律權利。

手機版|小黑屋|A-Plus互動討論區    

GMT+8, 2024-5-20 00:03 , Processed in 0.071340 second(s), 26 queries .

Powered by Discuz! X3

© 2001-2013 Comsenz Inc.

快速回復 返回頂部 返回列表