設為首頁收藏本站

A-Plus互動討論區

 找回密碼
 立即註冊

Login

免註冊即享有會員功能

搜索
熱搜: 活動 交友 discuz
查看: 7|回復: 0
打印 上一主題 下一主題

Harold Carmichael Eagles Jersey km1h4xhr

[複製鏈接]

3萬

主題

3萬

帖子

9萬

積分

論壇元老

Rank: 8Rank: 8

積分
95416
跳轉到指定樓層
樓主
發表於 2017-5-30 15:23:53 | 只看該作者 回帖獎勵 |倒序瀏覽 |閱讀模式
分享到: 更多
The Ministry of Agriculture has refuted reports in the Monday issue of Kaieteur News regarding the construction of a sluice door at Stryken Hovel, West Bank of Demerara, saying that the report did not paint a true representation of the facts.Last week,Authentic Paul Millsap Hawks Jersey, during an opening of bids for the contract by the National Procurement and Tender Administration Board,Dwight Howard Hawks Swingman Jersey, it was disclosed that an engineer’s estimate put the project at $5,Authentic Jimmy Butler Bulls Jersey,214,400.The Ministry says other associated works including wire rope, pulleys,Harrison Barnes Mavericks Swingman Jersey, gate guides, guiding strips. However,Jeremy Lin Nets Jersey, this picture contradicts the Ministry’s statement Responding to concerns raised over that estimate, the newspaper had carried a report on Monday questioning the project.According to the Ministry, the $5.2M estimate is for work on the entire sluice including two doors, not one as was reported in Kaieteur News.However, at the opening of the bids on February 22, the Tender Board had listed as description for the project, “construction of sluice door” at Stryken Hovel,Steven Adams Thunder Jersey, East Bank Essequibo-an incorrect address.Further, a visit to the site found that it was a two-door sluice and that one was in good condition.Kaieteur News was taken to the sluice where it was seen that the cables and other parts were in working condition.According to the Ministry, the scope of works and estimated cost which serve as guide for the project include, the installation of two new sluice doors, the installation of stop logs, “de-watering the pits of both sluice gates”, removal of existing sluice doors and the installation of new doors along with the servicing and repairs of the lifting mechanism, formed part of the project.Other associated works including wire ropes, pulleys, gate guides, guiding strips and the installation of various new components, a contingency sum for unforeseen works, cost for performance bond and cost for insurances as contained in the National Procurement and Tender Administration Board (NPTAB) standard bidding document formed part of the total cost, according to the Ministry.“These are cost elements that the Kaieteur News omitted in its story. If we were to extract the estimated cost to build a single new sluice door of specification given without the necessary temporary work and associated civil works, performance bond, insurances, cost for unforeseen works which can only be executed if directed by the engineer, repairs to lifting mechanism and replacement of various new components, the estimated cost for the replacement of one of the two sluice doors would in fact be $1.25M which will not see a fully operational structure,” the Ministry pointed out.When the bids were declared there was no mention of the additional works.Kaieteur News made contact with lumber dealers yesterday and based on the specifications of the doors, said that wooden material to construct them would not be beyond $650,Tracy McGrady USA Jersey,000.The ministry said “It must be pointed out that several of the bidders quoted prices that were above the engineer’s estimate which serve as a guide intended to generate a competitive and transparent process. In addition,Authentic Harrison Barnes Mavericks Jersey, no remedial works were done by the NDIA but rather by the Regional Democratic Council (RDC) over the last few years.”But other engineers told Kaieteur News that this is nonsense. The government should never use outside bids to justify an engineer’s estimate which is an in-house guide.The contractors are bidding to make a profit, one engineer said.“It would seem that the article is the latest attempt by the Kaieteur News to berate developmental projects by the government,” the Ministry said.Publisher of Kaieteur News, Glenn Lall, said, however, that the newspaper is interested in ensuring that taxpayers get the best value for their money. It is for this reason that the newspaper is challenging what seems to be highly inflated estimates.The damaged sluice, which was reportedly built in 2002,Taj Gibson Bulls Swingman Jersey, was constructed by a contractor, George Sarjoo.The sluice, according to individuals close to the project, was a disaster waiting to happen as it was never built to the correct width and as such, over time, the sides of the door quickly wore out due to friction and have now reached to the point where it slips out from the grooves meant to hold it in place.The sluice door was reportedly never tarred properly despite at least three sets of recent remedial works.
回復

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

重要聲明:本討論區是以即時上載留言的方式運作,A-Plus補習討論區對所有留言的真實性、完整性及立場等,不負任何法律責任。而一切留言之言論只代表留言者個人意見,並非本網站之立場,讀者及用戶不應信賴內容,並應自行判斷內容之真實性。於有關情形下,讀者及用戶應尋求專業意見(如涉及醫療、法律或投資等問題)。 由於本討論區受到「即時上載留言」運作方式所規限,故不能完全監察所有留言,若讀者及用戶發現有留言出現問題,請聯絡我們。A-Plus補習討論區有權刪除任何留言及拒絕任何人士上載留言(刪除前或不會作事先警告及通知),同時亦有不刪除留言的權利,如有任何爭議,管理員擁有最終的詮釋權。用戶切勿撰寫粗言穢語、誹謗、渲染色情暴力或人身攻擊的言論,敬請自律。本網站保留一切法律權利。

手機版|小黑屋|A-Plus互動討論區    

GMT+8, 2024-5-17 11:58 , Processed in 0.063110 second(s), 28 queries .

Powered by Discuz! X3

© 2001-2013 Comsenz Inc.

快速回復 返回頂部 返回列表