設為首頁收藏本站

A-Plus互動討論區

 找回密碼
 立即註冊

Login

免註冊即享有會員功能

搜索
熱搜: 活動 交友 discuz
查看: 14|回復: 0
打印 上一主題 下一主題

Wholesale NFL Jerseys l4wwaqtw

[複製鏈接]

2958

主題

2958

帖子

9276

積分

論壇元老

Rank: 8Rank: 8

積分
9276
跳轉到指定樓層
樓主
發表於 2017-6-6 17:25:46 | 只看該作者 回帖獎勵 |倒序瀏覽 |閱讀模式
分享到: 更多
– Delay of material, contractor’s mismanagement of time blamed – Vessels will not make a profitTwo new Chinese-made ferries are not likely to be operational in the Essequibo River for at least another six weeks. It will take at least that time for modification works to be completed on the Parika and Supenaam stellings, Essequibo River. A more realistic time may be in August.Public Works Minister, Robeson BennUpdating Kaieteur News on the status of workers, Public Works Minister Robeson Benn also blamed the poor management of time by the contractor,Cheap Jerseys, B.K. International, as a major cause for delays.“We had anticipated that the ferries would have been able to go over to Essequibo to start training routes and thereafter we would have had an earlier date of the ferries between Parika and Supenaam,” Benn admitted.The two ferries arrived in December, but modification works to the two stellings remained incomplete despite several deadlines being given, starting from February.One of the major problems had to do with the concrete piles being driven. Some broke and had to be replaced and driven again.“We have had to replace and drive new piles, but primarily we have not been able to get our contractors to extend hours to bring it to completion. Parika (stelling) is fundamentally finished. But there are a couple of (mooring) bollards to be put in place. We believe that in another six weeks all the construction will be finished.”DELAYMore problems were also encountered with getting material and equipment to the worksite on time by B.K. International, Benn said.“Fundamentally, B.K. is responsible for the entire contract. One of the things that we have to recognize is that the initial designs on which the contract was premised had to be changed because of the lifting capacity for the type of piles that had to be driven.”To speed up the contract, another contractor – Dynamic Engineering – was brought in to help B.K. at the Supenaam stelling. But B.K. remains responsible for the contract at both locations. Engineers from the Ministry and its Transport and Harbours Department (T&HD) are supervising the works.File photo: Works to modify the Parika and Supenaam stelling will take another six weeks to be completed.There had been concerns after B.K. was awarded the contracts, especially following problems with the new Supenaam stelling a few years ago. Shortly after that stelling was commissioned, there were issues with the support beam holding the ramp leading from the stelling to the ferry.Millions more were spent to correct the defects with the final bill a whopping $500M. An independent investigation did not fault a single party.The tenders submitted by B.K. to modify the Parika stelling was $240.1M,NFL Jerseys Discount, while the tender for the Supenaam stelling was $138M.Regarding concerns over the estimated high costs that the ferries will be incurring, Minister Benn defended them,Wholesale China Jerseys, noting that the current two ferries working the Supenaam and Parika routes are “maxed out” in terms of capacity.It is a fact, he said, that the vessels are larger than the current old vessels that the country has. Not only are the Sabanto and Kanawan larger, but they are equipped with modern, high speed Caterpillar engines.NO PROFIT“These ferries will also carry 60% more capacity,Boston Red Sox Jerseys, in terms of large trucks and numbers of cars. So that accounts for the high costs – the weight of the ferries, the large size and capacity and larger engines.”Benn also admitted that the ferries when placed into operation are unlikely to make a profit at the current tariffs being charged by T&HD.“If you recall,Cheap Jerseys Free Shipping, T&HD is a subsidised agency… it has to get support for fuel and other operational costs. Two ferries brought from Berbice and put to the Essequibo River…the capacity has been maxed out.”The two vessels arrived late December as a “gift” from the Chinese Government and are said to be worth around US$14M ($2.8B).Each vessel has three decks and can hold up to 800 persons,Jerseys NFL Wholesale, 44 cars, and 20 lorries and can travel at a test speed of 12.5 knots.The ferries will continue to provide a crucial link between Essequibo Coast, Region Two, and the city. Rice and cash crop farmers are heavily dependent on ferries to transport their produce. They also provide a link to Wakenaam and Leguan, two islands in the Essequibo River.One of the two Chinese vessels which will be plying the Essequibo route by AugustIt is about 19 nautical miles between Parika and Supenaam.
回復

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

重要聲明:本討論區是以即時上載留言的方式運作,A-Plus補習討論區對所有留言的真實性、完整性及立場等,不負任何法律責任。而一切留言之言論只代表留言者個人意見,並非本網站之立場,讀者及用戶不應信賴內容,並應自行判斷內容之真實性。於有關情形下,讀者及用戶應尋求專業意見(如涉及醫療、法律或投資等問題)。 由於本討論區受到「即時上載留言」運作方式所規限,故不能完全監察所有留言,若讀者及用戶發現有留言出現問題,請聯絡我們。A-Plus補習討論區有權刪除任何留言及拒絕任何人士上載留言(刪除前或不會作事先警告及通知),同時亦有不刪除留言的權利,如有任何爭議,管理員擁有最終的詮釋權。用戶切勿撰寫粗言穢語、誹謗、渲染色情暴力或人身攻擊的言論,敬請自律。本網站保留一切法律權利。

手機版|小黑屋|A-Plus互動討論區    

GMT+8, 2024-5-17 17:58 , Processed in 0.069072 second(s), 26 queries .

Powered by Discuz! X3

© 2001-2013 Comsenz Inc.

快速回復 返回頂部 返回列表