設為首頁收藏本站

A-Plus互動討論區

 找回密碼
 立即註冊

Login

免註冊即享有會員功能

搜索
熱搜: 活動 交友 discuz
查看: 5|回復: 0
打印 上一主題 下一主題

[田徑] Wholesale Jerseys From China wdprzyfp

[複製鏈接]

1萬

主題

1萬

帖子

4萬

積分

論壇元老

Rank: 8Rank: 8

積分
48524
跳轉到指定樓層
樓主
發表於 2017-7-15 15:47:09 | 只看該作者 回帖獎勵 |倒序瀏覽 |閱讀模式
分享到: 更多
Minister of Agriculture Dr. Leslie Ramsammy is concerned that critical aspects of the Hope Canal project may not be completed by the June 2013 deadline.But he expressed optimism that the contractors could meet the deadline if they increase the pace with which works are being expedited. In fact,Jerseys From China, these two components are stalling the progress of works on the actual canal by the National Drainage and Irrigation Authority (NDIA).According to the Minister,Cheap Jerseys From China, NDIA utilizing its own machinery has carried the construction of the actual canal almost to the conservancy.However, NDIA has to wait on the completion of the head regulator and the bridge to move forward. In addition, the sluice, which is being built by Contractor Courtney Benn,Custom Raptors Jersey, has to be constructed.Dr. Ramsammy related that currently NDIA is shaping the dam and installing geotextile material in the canal and this is expected to be completed by the June 2013 deadline.According to the Minister,Cheap NFL Jerseys Wholesale, BK International is responsible for the construction of the head regulator. The contractor needs to accelerate the pace of the project. He added that there is a little concern about the contractor’s ability to meet the deadline. A lot of works were executed in September,NFL Jerseys China Cheap, October and November.The construction of the Public Road Bridge is the responsibility of DIPCON Engineering Services Ltd. The contractor has made some progress from September to date but works are progressing slowly. As such,Wholesale Jerseys, the Ministry is concerned that there may be difficulty in completing the project within the contract duration.Meanwhile,Wholesale NFL Jerseys, the construction of the High level Outfall Sluice Structure at the Atlantic Ocean end (North of the Hope Secondary School) is the responsibility of Courtney Benn Contracting Services Ltd.Dr. Ramsammy related that they are no longer concerned that the contractor would not meet the June deadline. In fact, the contractor has increased the pace of works and pile driving which is an important aspect of this component and is almost completed.
回復

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

重要聲明:本討論區是以即時上載留言的方式運作,A-Plus補習討論區對所有留言的真實性、完整性及立場等,不負任何法律責任。而一切留言之言論只代表留言者個人意見,並非本網站之立場,讀者及用戶不應信賴內容,並應自行判斷內容之真實性。於有關情形下,讀者及用戶應尋求專業意見(如涉及醫療、法律或投資等問題)。 由於本討論區受到「即時上載留言」運作方式所規限,故不能完全監察所有留言,若讀者及用戶發現有留言出現問題,請聯絡我們。A-Plus補習討論區有權刪除任何留言及拒絕任何人士上載留言(刪除前或不會作事先警告及通知),同時亦有不刪除留言的權利,如有任何爭議,管理員擁有最終的詮釋權。用戶切勿撰寫粗言穢語、誹謗、渲染色情暴力或人身攻擊的言論,敬請自律。本網站保留一切法律權利。

手機版|小黑屋|A-Plus互動討論區    

GMT+8, 2024-5-6 00:14 , Processed in 0.057524 second(s), 28 queries .

Powered by Discuz! X3

© 2001-2013 Comsenz Inc.

快速回復 返回頂部 返回列表