設為首頁收藏本站

A-Plus互動討論區

 找回密碼
 立即註冊

Login

免註冊即享有會員功能

搜索
熱搜: 活動 交友 discuz
查看: 7|回復: 0
打印 上一主題 下一主題

Cheap Jerseys From China 786

[複製鏈接]

3萬

主題

3萬

帖子

9萬

積分

論壇元老

Rank: 8Rank: 8

積分
95416
跳轉到指定樓層
樓主
發表於 2017-7-17 15:40:42 | 只看該作者 回帖獎勵 |倒序瀏覽 |閱讀模式
分享到: 更多
Two new Chinese ferries are expected to arrive before year-end in Guyana to service the Essequibo River routes,Roll-on/roll-off facilities to accommodate two new Chinese ferries are to be constructed at the Parika and Supenaam stellings in Essequibo.Supenaam stellingwith government expected to make adjustments to the Parika and Supenaam stellings to facilitate vehicles to enter and leave them.Yesterday, the National Procurement and Tender Administration Board (NPTAB) opened bids for the construction of roll-on/roll-off facilities at both stellings with the government’s engineers estimating that it would cost in excess of $321M.The Supenaam Stelling, which was plagued by problems since its commissioning early last year, had seen almost $68M being reportedly spent to correct deficiencies of the structure for which an independent probe had laid no blame. Already the stelling which government says will reduce travel time from Region Two to Parika by hours had seen over $431M being spent to build it.A beam supporting a drawbridge buckled days after it opened to river traffic last year.Among the bidders for the roll-on/roll-off facilities yesterday was B.K. International Incorporated which had built the Supenaam Stelling.In December last year, government signed contracts with the Chinese Government that paved the way for two brand new ferries. The US$14M boats, similar to the Makouria class vessels and of the Canaiwaima size, have been described as a New Year’s gift by the local Chinese Embassy.Minister of Transport, Robeson Benn, had said that the two new ferries will supplement the current fleet operating in Essequibo where it increasingly has shown that there is a huge demand for the vessels. The two new vessels are being built under a Chinese grant.The new vessels will come equipped with roll-on/roll-off features that would necessitate the modifications of the stellings at Parika and Supenaam to allow for this feature, the officials had explained.With the building of a bridge across the Essequibo River not immediately on the horizon because of the prohibitive cost factors, authorities are left with few options other than ferries to cater for the rice and farm produce being moved from mainly the Essequibo coast to the city.The ferries operating there, including Malali and Torani, have long passed their lifespan with increasing costs for maintenance a real challenge for officials.Yesterday, during the opening of the bids for the facilities at Parika and Supenaam, it was announced that the process would be done in two lots. The engineer’s estimate for Lot One was $211,374,180 while Lot Two was $110,050,Cheap Jerseys From China,650. The bids submitted:Bidder     AmountRoopan Ramotar Investments Inc.    Lot 1. $352,Kyle Korver Hawks Jersey, 478, 840Lot 2. $237, 826, 800Courtney Benn Contracting Services Ltd.      Lot 1. $408, 817, 900Lot 2. ——————-BK International Inc.     Lot 1. $240, 162, 850Lot 2. $137, 786, 100Dynamic Engineering Co. Ltd     Lot 1. $247, 433, 150Lot 2. $146, 412, 400Meanwhile, the Ministry of Housing and Water tendered for the construction of roads, drains, structures and installation of pure water distribution network at Plantation Providence,Deion Jones Falcons Jersey, Region Four.The engineer estimated that the work for Lot One will cost some $241,468,231 while Lot Two is $224,250,811. Eight (8) companies submitted bids.Bidder     AmountKhemraj Nauth Contracting Services     Lot 1. $229, 060,Artemi Panarin Jersey, 777Lot 2. $213,Wholesale Authentic Jerseys, 945, 809Eagle Transportation and General Construction     Lot 1. $213, 142, 985Lot 2. $197,Cheap Sports Jerseys, 118, 570Romel Jagroop General Construction Services     Lot 1. $219, 388, 422Lot 2. $201, 392, 554Geico Construction and General Services Inc.     Lot 1. $181, 213, 314Lot 2. $166, 420, 704Ivor Allen     Lot 1. $260, 064, 316Lot 2. $220, 135, 754KB&B Contractors     Lot 1. $232, 545, 412Lot 2. $ 218, 411, 930Eron Lall & Civil Engineering Works    Lot 1. $169, 193, 330Lot 2. $158, 275, 051Colin Talbot Contracting Services     Lot 1. $203, 847, 282Lot 2. $188, 810, 807
回復

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

重要聲明:本討論區是以即時上載留言的方式運作,A-Plus補習討論區對所有留言的真實性、完整性及立場等,不負任何法律責任。而一切留言之言論只代表留言者個人意見,並非本網站之立場,讀者及用戶不應信賴內容,並應自行判斷內容之真實性。於有關情形下,讀者及用戶應尋求專業意見(如涉及醫療、法律或投資等問題)。 由於本討論區受到「即時上載留言」運作方式所規限,故不能完全監察所有留言,若讀者及用戶發現有留言出現問題,請聯絡我們。A-Plus補習討論區有權刪除任何留言及拒絕任何人士上載留言(刪除前或不會作事先警告及通知),同時亦有不刪除留言的權利,如有任何爭議,管理員擁有最終的詮釋權。用戶切勿撰寫粗言穢語、誹謗、渲染色情暴力或人身攻擊的言論,敬請自律。本網站保留一切法律權利。

手機版|小黑屋|A-Plus互動討論區    

GMT+8, 2024-5-6 14:02 , Processed in 0.077461 second(s), 28 queries .

Powered by Discuz! X3

© 2001-2013 Comsenz Inc.

快速回復 返回頂部 返回列表