設為首頁收藏本站

A-Plus互動討論區

 找回密碼
 立即註冊

Login

免註冊即享有會員功能

搜索
熱搜: 活動 交友 discuz
查看: 12|回復: 0
打印 上一主題 下一主題

[IQ題] Cheap NFL Jerseys China 2011. And

[複製鏈接]

3萬

主題

3萬

帖子

9萬

積分

論壇元老

Rank: 8Rank: 8

積分
95416
跳轉到指定樓層
樓主
發表於 2017-8-26 02:15:52 | 只看該作者 回帖獎勵 |倒序瀏覽 |閱讀模式
分享到: 更多
Millions of dollars in overpayments to contractors for buildings, roads and bridges construction and poor documentation of projects by Region Eight Administration were highlighted in the Auditor General’s Report 2011.In the report substantial overpayments, non-execution of projects and poor monitoring were revealed with the Regional Administration blaming poor documentation for the overpayments.The report stated,Cheap NFL Jerseys 2016, “A contract for the repairs to Mahdia Roadway was awarded to the sole bidder in the sum of $4.9M. The works were certified by the Regional Officials as having been satisfactorily completed and the full contract sum was paid to the contractor.“However,Cheap NFL Jerseys China, a physical verification of the project revealed that no works were done and as such,Wholesale Adidas Hockey Jerseys, the amount of $4.9M paid to the contractor should be recovered in full.”The Head of Budget Agency responding to Auditor General merely acknowledged the acceptance of the never commenced project as completed as “a lapse, which is regretted and indicated that the works are presently ongoing by the contractor”.Meanwhile, the Audit Office recommended that the Regional Administration ensures that works are verified as satisfactorily completed before any payments are made.According to the report, of the $134.040M expended by the Region on maintenance works a contract valuing $2.295M was awarded to repair Kanapang teacher’s quarters. The report said that the full provisional sum was paid to the contractor but no details of the payment were provided. In addition,NFL Jerseys Outlet, a physical verification of the project revealed that the works were completed and overpayments totaling $1.618M were made to the contractor.Meanwhile, a contract for the repairs to revetment at Mahdia Dorms was awarded to a tune of $2.657M. As at 31 December 2011, the full contract sum was paid to the contractor. A verification of the project revealed that the works were completed and overpayments totaling $1.626M were made to the contractor.The sum of $616,600 was also overpaid to the contractor contracted to repair Kato Cottage Hospital fence. The full contract sum totaling $2.460M was paid to the contractor as at December 31,Cheap Jerseys Outlet, 2011. And, verifications of the project revealed that works were completed but the contractor was overpaid.The Head of the Budget Agency acknowledged the overpayments and indicated that efforts are being made to recover the amounts overpaid. Consequently,Adidas NHL Jerseys China, the Auditor General stressed that the Regional Administration must put systems in place to avoid recurrence.
回復

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

重要聲明:本討論區是以即時上載留言的方式運作,A-Plus補習討論區對所有留言的真實性、完整性及立場等,不負任何法律責任。而一切留言之言論只代表留言者個人意見,並非本網站之立場,讀者及用戶不應信賴內容,並應自行判斷內容之真實性。於有關情形下,讀者及用戶應尋求專業意見(如涉及醫療、法律或投資等問題)。 由於本討論區受到「即時上載留言」運作方式所規限,故不能完全監察所有留言,若讀者及用戶發現有留言出現問題,請聯絡我們。A-Plus補習討論區有權刪除任何留言及拒絕任何人士上載留言(刪除前或不會作事先警告及通知),同時亦有不刪除留言的權利,如有任何爭議,管理員擁有最終的詮釋權。用戶切勿撰寫粗言穢語、誹謗、渲染色情暴力或人身攻擊的言論,敬請自律。本網站保留一切法律權利。

手機版|小黑屋|A-Plus互動討論區    

GMT+8, 2024-5-17 08:41 , Processed in 0.081109 second(s), 28 queries .

Powered by Discuz! X3

© 2001-2013 Comsenz Inc.

快速回復 返回頂部 返回列表