設為首頁收藏本站

A-Plus互動討論區

 找回密碼
 立即註冊

Login

免註冊即享有會員功能

搜索
熱搜: 活動 交友 discuz
查看: 7|回復: 0
打印 上一主題 下一主題

[泰拳] Cheap Jerseys From China qv3itdda

[複製鏈接]

1萬

主題

1萬

帖子

4萬

積分

論壇元老

Rank: 8Rank: 8

積分
45633
跳轉到指定樓層
樓主
發表於 2017-8-30 22:23:37 | 只看該作者 回帖獎勵 |倒序瀏覽 |閱讀模式
分享到: 更多
The Public Works Ministry is expected to construct 20 drainage structures designed to withstand current and projected rainfall intensity for the next 50 years in several communities on the West Coast Berbice and East Bank Demerara by October month-end.This is according to Sunil Ganesh, Bridges Engineer of the Public Works Ministry. He noted that even with climate change, engineers could predict the pattern of rainfall base on a hydraulic analysis over the past 10 years.He said that this US$5.3M project is expected to improve drainage for farming communities.Ganesh said last year July that the project to rehabilitate two bridges at Coverden and Timehri, East Bank Demerara, and 18 on West Coast Berbice has commenced.Culvert constructed at West Coast Berbice.The contractor Kares Engineering is tasked with reconstructing the bridge at Coverden, rehabilitating the structure at Timehri, one at Carlton Hall,Wholesale Jerseys From China, and seven between Belladrum and Cotton Tree to a tune of US$2.6M.He said that the structure at Coverden has been reopened to traffic but is incomplete. The contractor has to erect the head and wing walls on both sides. And, rehabilitative works at Timehri include repairs to the head and wing walls to prevent the road from being eroded. He added that a revetment has to be erected to prevent erosion of the roadway.Meanwhile, V. Dalip Enterprise was contracted to rehabilitate bridges between Bath Settlement and Cotton Tree to the tune of US$2.7M. He noted that several of these bridges have been completed and works are being done to conclude the project by the October deadline.This project is Lot B of the Inter-American Development Bank funded Transport Infrastructure Rehabilitation Programme. Lot A was executed between 2009 and 2013 and saw the enhancement of 25 structures between Timehri and Rosignol.He said that Lot One of this infrastructural project started in 2003. Since then 83 bridges between Timehri and Rosignol were constructed.
回復

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

重要聲明:本討論區是以即時上載留言的方式運作,A-Plus補習討論區對所有留言的真實性、完整性及立場等,不負任何法律責任。而一切留言之言論只代表留言者個人意見,並非本網站之立場,讀者及用戶不應信賴內容,並應自行判斷內容之真實性。於有關情形下,讀者及用戶應尋求專業意見(如涉及醫療、法律或投資等問題)。 由於本討論區受到「即時上載留言」運作方式所規限,故不能完全監察所有留言,若讀者及用戶發現有留言出現問題,請聯絡我們。A-Plus補習討論區有權刪除任何留言及拒絕任何人士上載留言(刪除前或不會作事先警告及通知),同時亦有不刪除留言的權利,如有任何爭議,管理員擁有最終的詮釋權。用戶切勿撰寫粗言穢語、誹謗、渲染色情暴力或人身攻擊的言論,敬請自律。本網站保留一切法律權利。

手機版|小黑屋|A-Plus互動討論區    

GMT+8, 2024-5-18 17:58 , Processed in 0.067716 second(s), 26 queries .

Powered by Discuz! X3

© 2001-2013 Comsenz Inc.

快速回復 返回頂部 返回列表