設為首頁收藏本站

A-Plus互動討論區

 找回密碼
 立即註冊

Login

免註冊即享有會員功能

搜索
熱搜: 活動 交友 discuz
查看: 5|回復: 0
打印 上一主題 下一主題

Jerseys NFL Wholesale ASDU

[複製鏈接]

3萬

主題

3萬

帖子

10萬

積分

論壇元老

Rank: 8Rank: 8

積分
102747
跳轉到指定樓層
樓主
發表於 2017-8-31 23:39:33 | 只看該作者 回帖獎勵 |倒序瀏覽 |閱讀模式
分享到: 更多
– Kaieteur News stands by storyThe bridge that contractor Roopan Ramotar (inset) said he was paid $26.3 million to complete, but which the Ministry of Agriculture now claims is not part of works in Ramotar’s contract. The Ministry of Agriculture has claimed that the bridge at Ruby backdam, which was shown on Page One of yesterday’s Kaieteur News (August 24,Wholesale Authentic Jerseys, 2009) was built a decade ago, but this claim does not stand, based on information supplied to this newspaper by the contractor involved.Frederick Flatts,Cheap NFL Jerseys China, the Senior Civil Engineer with the Agricultural Sector Development Unit (ASDU), in a media release, accused Kaieteur News of “callous reporting and mischief to manufacture a perception of over-priced projects and wastage.” Flatts went on to accuse this newspaper of carrying out “a dishonest campaign intended to discredit the hard work of the sector to bring improvements to farming conditions.”The photograph published was taken on August 14, 2009, when Kaieteur News accepted an invitation by the Ministry to inspect projects being executed in the Drainage and Irrigation Sector.Frederick Flatts,Cheap Stitched Jerseys, Senior Civil Engineer with the ASDUAt that time, reporters from this newspaper visited projects being executed by Essequibo contractor, Roopan Ramotar,Cheap Jerseys From China Outlet, popularly known as ‘Fowl Cock’ who has a $385 million contract which covers the construction of drainage and irrigation structures,Wholesale Jerseys From China, building/repairing bridges and rehabilitation of roads.Flatts claimed that the Agricultural Support Services Project has not constructed any bridge at Ruby Backdam as published on the front page of the August 24, 2009 edition of the Kaieteur News.The Ministry of Agriculture also claimed that the other media houses that attended the site visit on August 14, 2009 “can easily verify that no bridge in the Ruby Backdam was identified as complete or under construction,Jerseys NFL Wholesale, let alone the mention of any cost.”This newspaper would not comment on the work of other media houses, but notes that the only other private media on the assignment was Evening News.On the visit to Ruby Backdam, Kaieteur News reporters noted that a section of the bridge had fallen into the canal (as the photo indicates) and specifically asked Mr Ramotar if the bridge in question was part of his contract. He responded in the affirmative, and said it was completed a month ago.When this newspaper inquired about the cost of bridge, he said he did not have the information at hand, and said he would provide the cost following the inspection tour. On the evening of the same date, a Kaieteur News reporter contacted Mr Ramotar via telephone to ask him for the project cost.He did not have the information as yet.On the morning of August 15, it was the very contractor who himself contacted the Kaieteur News reporter via telephone to supply the cost of the bridge – $26.3 million – as reported.When the decision was made to publish the photo, the reporter again contacted the contractor for confirmation of the cost involved in constructing the bridge, and again, he gave the same figure – $26.3 million.Kaieteur News therefore stands by its story.
回復

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

重要聲明:本討論區是以即時上載留言的方式運作,A-Plus補習討論區對所有留言的真實性、完整性及立場等,不負任何法律責任。而一切留言之言論只代表留言者個人意見,並非本網站之立場,讀者及用戶不應信賴內容,並應自行判斷內容之真實性。於有關情形下,讀者及用戶應尋求專業意見(如涉及醫療、法律或投資等問題)。 由於本討論區受到「即時上載留言」運作方式所規限,故不能完全監察所有留言,若讀者及用戶發現有留言出現問題,請聯絡我們。A-Plus補習討論區有權刪除任何留言及拒絕任何人士上載留言(刪除前或不會作事先警告及通知),同時亦有不刪除留言的權利,如有任何爭議,管理員擁有最終的詮釋權。用戶切勿撰寫粗言穢語、誹謗、渲染色情暴力或人身攻擊的言論,敬請自律。本網站保留一切法律權利。

手機版|小黑屋|A-Plus互動討論區    

GMT+8, 2024-5-17 00:38 , Processed in 0.075366 second(s), 26 queries .

Powered by Discuz! X3

© 2001-2013 Comsenz Inc.

快速回復 返回頂部 返回列表