設為首頁收藏本站

A-Plus互動討論區

 找回密碼
 立即註冊

Login

免註冊即享有會員功能

搜索
熱搜: 活動 交友 discuz
查看: 15|回復: 0
打印 上一主題 下一主題

Frank Thomas White Sox Jersey ketxy25c

[複製鏈接]

3萬

主題

3萬

帖子

10萬

積分

論壇元老

Rank: 8Rank: 8

積分
102747
跳轉到指定樓層
樓主
發表於 2017-9-1 15:36:00 | 只看該作者 回帖獎勵 |倒序瀏覽 |閱讀模式
分享到: 更多
– Sithe Global not fully outBy Leonard GildarieThe 165-megawatt Amaila Falls hydro project remains very much alive with Government not ruling out asking China for additional backings.The disclosures were made yesterday by Government during a presentation by the Guyana Power and Light Inc. (GPL) to Parliament’s Sectoral Committee on Natural Resources.Prime Minister Sam Hinds,Travis Benjamin Chargers Jersey, GPL’s Chairman Winston Brassington and other executives update a key Parliament committee on developments in the sector.The US$840M-plus project was left hanging in limbo last August after the US developer, Sithe Global, announced its pullout. This was because the National Assembly remained split on key legislations that were critical for partial project financing by the Inter-American Development Bank (IDB). The Opposition had been unconvinced on how the monies would have been spent, among other things.Sithe Global made it clear, then,Larry Bird Team USA Jersey, that the flagship project, which it would manage for 20 years before handing it over to Government, needed the full backings of the National Assembly.Since then,Ilkay Gundogan Jersey, Government has remained largely quiet on the project’s future, the country’s biggest infrastructural development in terms of costs, only saying that they were exploring a number of options.Yesterday, Government’s point man on the project, Winston Brassington, based on questions from the Opposition’s Members of Parliament (MPs), disclosed that Government had started looking at a number of options after Sithe Global’s pullout,Celtics Throwback Jersey, recognizing that the parties involved had spent considerable time and monies in developing it.The contractor,Darren Sproles Eagles Jersey, China Railway First Group, remains “keenly committed” to the project. So does China Development Bank, the official said.Brassington, the current Chairman of GPL, made it clear that China is willing to step in and “fill the gap” with regards to financing.Under the financing structure, in the original arrangement, Sithe Global would have been putting in US$152M; IDB US$175M, Guyana US$100M and CDB US$413M.China Rail had already signed an Engineering, Procurement and Construction (EPC) agreement with Sithe for US$506M. Some 70 per cent of the total funding would have been coming from the CDB and the IDB.Brassington, however, stressed yesterday that talks are still ongoing with the partners with any negotiations still at a preliminary stage. Before the end of this first quarter,MLB Jerseys China Authentic, Government would be in a better position to know the next step.The official is not ruling out Sithe Global returning to the picture. Rather,Cheap Jerseys From China, the options on the table are a Chinese-led project or the possibilities of the existing partners being returned.While not naming them, Brassington said that a number of other parties have also shown interest in the project.However, it was recognized yesterday that if Guyana engages a full Chinese-led arrangement, it may run into some problems.Sithe Global has done significant preparations for the financing and any attempt to revive Amaila may have to entail negotiations with them to possible even buy some of the information. That is in case Sithe Global does not want to be a part of the project anymore.Yesterday,Dave Robinson Packers Throwback Jersey, Joseph Harmon, senior Member of Parliament for A Partnership For National Unity, the largest Opposition faction, insisted that his side remained supportive of hydro electric power but would like to see the IDB feasibility study on the project presented.This would be a critical starting point in bringing back the project. He also hinted that APNU’s approval would not be far if the IDB feasibility study is positive.The government would be more than happy for the support of APNU which voted against the Amaila Falls motions last year. Prime Minister Hinds in expressing his optimism for the support said that the Government is continuing to “keep things warm”.The Chinese angle in the Amaila Falls project would come at a time when the US has reportedly passed new laws which mandate its representatives on key bilateral funding agencies not to support funding for large hydro projects because of environmental and other concerns.These funding agencies include USAID and World Bank. While IDB is not named,Lynn Swann Steelers Jersey, the report said that Guyana is one of the projects that could be affected.Government yesterday said that it is still assessing the report.Guyana has had a growing relationship with China with funding for projects including the US$150M expansion to the Cheddi Jagan International Airport and the Skeldon sugar modernization plan which involved a new factory in East Berbice.Meanwhile, with regards to the access roads to the Amaila Falls site in Region Eight, Brassington said that China Rail which had been given a section is nearing completion with final works expected in March.Some other sections remained behind schedule with the Ministry of Public Works examining options. However, these are not so critical.The roads had been a major thorn in the side of the hydro project after it was awarded to Synergy Holdings Inc, whose principal, Makeshwar ‘Fip’ Motilall, was the original mover for the project. The US$15M access roads faced several delays and the contract was terminated in January 2012 by the government.It was later awarded in parts to several contractors. Some sections again fell behind and Section Seven was later awarded to China Rail, the same contractor who is set to build the hydro dam.Government has been pushing for the hydro-electric project saying it remains the best option to the huge fuel import bill that Guyana is saddled with to feed its many power station.
回復

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

重要聲明:本討論區是以即時上載留言的方式運作,A-Plus補習討論區對所有留言的真實性、完整性及立場等,不負任何法律責任。而一切留言之言論只代表留言者個人意見,並非本網站之立場,讀者及用戶不應信賴內容,並應自行判斷內容之真實性。於有關情形下,讀者及用戶應尋求專業意見(如涉及醫療、法律或投資等問題)。 由於本討論區受到「即時上載留言」運作方式所規限,故不能完全監察所有留言,若讀者及用戶發現有留言出現問題,請聯絡我們。A-Plus補習討論區有權刪除任何留言及拒絕任何人士上載留言(刪除前或不會作事先警告及通知),同時亦有不刪除留言的權利,如有任何爭議,管理員擁有最終的詮釋權。用戶切勿撰寫粗言穢語、誹謗、渲染色情暴力或人身攻擊的言論,敬請自律。本網站保留一切法律權利。

手機版|小黑屋|A-Plus互動討論區    

GMT+8, 2024-5-4 02:20 , Processed in 0.065776 second(s), 28 queries .

Powered by Discuz! X3

© 2001-2013 Comsenz Inc.

快速回復 返回頂部 返回列表