設為首頁收藏本站

A-Plus互動討論區

 找回密碼
 立即註冊

Login

免註冊即享有會員功能

搜索
熱搜: 活動 交友 discuz
查看: 9|回復: 0
打印 上一主題 下一主題

Cheap Jerseys From China Guyana

[複製鏈接]

3萬

主題

3萬

帖子

9萬

積分

論壇元老

Rank: 8Rank: 8

積分
95416
跳轉到指定樓層
樓主
發表於 2017-9-11 08:52:32 | 只看該作者 回帖獎勵 |倒序瀏覽 |閱讀模式
分享到: 更多
… pontoon crossing still to be awarded  Some workers on the Amaila Falls Access Road this past weekendEver since the fiasco involving Makeshwar ‘Fip’ Motilall’s Synergy Holdings Inc, for the construction of the Amaila Falls Access Road, government has allocated in excess of US$23M in contracts to more than 10 different companies,Wholesale Jerseys, along with the Forces Account Department of the Ministry of Public Works, in efforts to complete the project.This figure excludes amounts that would have already been paid to Motilall and also does not include the pontoon crossing over the Essequibo River.The Public Works Ministry will, by the end of this month, move to invite bidders for that aspect of the project.Motilall was paid just about US$12M for his role in the road project. Essentially,Authentic Jerseys From China, government would have to date given out more than US$38.4M (approx. G$7.7B) in contracts to build the Amaila Falls Access Road. Synergy Holdings Inc’s original contract was worth US$15.4M for the entire stretch of road and crossings.The road project is being undertaken in a number of segments,wholesale nfl jerseys, with the Ministry of Public Works assuming responsibility for ‘section two.’ That section runs along the Mabura Road to the Essequibo River and has a contract price of $336,094,861. This publication has been informed that some $63.2M of that money has already been disbursed, with a completion date set in December.Section three was allocated to Toolsie Persaud Quarries Inc. for $373.3M. That section of the Amaila Falls road stretches from Butukari to the Kaburi Village bypass. Of that amount, some $205M has already been disbursed. It is 61 per cent finished and is scheduled to be completed by the end of September this year.The same company has also been awarded a contract for section four of the road for $246M.Section four runs between from the Kaburi/Omai junction to the Issano bypass and already more than $140M of that contract sum has been paid out. That section is reportedly 84 per cent finished and is scheduled to be completed by August 31 this year.Ivor Allen was awarded the $182.3M contract for section five of the road that runs the Issano junction to Craig Road. Of that contract sum,Cheap NFL Jerseys, $137.5M has already been disbursed and while it had been scheduled to be completed in July this has had to be revised. That section of the road is 85 per cent completed and is now scheduled to be finished by the end of August.Section six of the road was awarded to G Bovell Construction Services for $281.7M,NFL Jerseys Cheap, but had to be terminated. It was subsequently granted in two lots, with the first from Issano Junction to Sorrow Hill being allocated to Ivor Allen for $145M of which some $65M has already been paid over. That section of the road,Soccer Jerseys China, according to reports, is 40 per cent finished with a scheduled completion date at the end of September.The second lot of section six was awarded to Dwarka Nauth for $45M.Hassan N Pasha General Building and Civil Contractor was handed the last and reportedly most difficult section of the road, ‘section seven’ with a contract price of $838M.That contract was terminated in April last after only 15 per cent of the work was completed.Pasha received almost $315M.That contract was subsequently handed to China Railway First Group (Guyana) Inc for $1.7B (US$8.5M). The Chinese company is currently mobilizing its equipment which landed in Guyana over the weekend and has until year end to complete the contract.Additionally, Dynamic Engineering received the contract for the design and construction of the Kuribrong River Bridge. The contract price for the design of the bridge is $34.9M while the contract price to build the bridge is $358.2M.The design for the bridge has been completed and has been presented to the Ministry of Public Works for review. Construction is scheduled to begin next month.This publication was informed that the pontoons for the Essequibo crossing are currently being stored at Butakari. A tender for the assembly of the pontoons, wheel house and propulsion unit for the Essequibo crossing is reportedly under preparation and this publication understands that the government intends to go out for bids for these works by the end of this month.
回復

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

重要聲明:本討論區是以即時上載留言的方式運作,A-Plus補習討論區對所有留言的真實性、完整性及立場等,不負任何法律責任。而一切留言之言論只代表留言者個人意見,並非本網站之立場,讀者及用戶不應信賴內容,並應自行判斷內容之真實性。於有關情形下,讀者及用戶應尋求專業意見(如涉及醫療、法律或投資等問題)。 由於本討論區受到「即時上載留言」運作方式所規限,故不能完全監察所有留言,若讀者及用戶發現有留言出現問題,請聯絡我們。A-Plus補習討論區有權刪除任何留言及拒絕任何人士上載留言(刪除前或不會作事先警告及通知),同時亦有不刪除留言的權利,如有任何爭議,管理員擁有最終的詮釋權。用戶切勿撰寫粗言穢語、誹謗、渲染色情暴力或人身攻擊的言論,敬請自律。本網站保留一切法律權利。

手機版|小黑屋|A-Plus互動討論區    

GMT+8, 2024-5-15 05:44 , Processed in 0.081696 second(s), 28 queries .

Powered by Discuz! X3

© 2001-2013 Comsenz Inc.

快速回復 返回頂部 返回列表