設為首頁收藏本站

A-Plus互動討論區

 找回密碼
 立即註冊

Login

免註冊即享有會員功能

搜索
熱搜: 活動 交友 discuz
查看: 5|回復: 0
打印 上一主題 下一主題

Cheap Jerseys USA 1

[複製鏈接]

3萬

主題

3萬

帖子

10萬

積分

論壇元老

Rank: 8Rank: 8

積分
102747
跳轉到指定樓層
樓主
發表於 2017-11-9 03:20:26 | 只看該作者 回帖獎勵 |倒序瀏覽 |閱讀模式
分享到: 更多
In an article published by Kaieteur News yesterday, Opposition members Joseph Harmon and Khemraj Ramjattan presented a Pakistani hydro project as comparable to Amaila.  In reality,Wholesale Jerseys Free Shipping, the Pakistani project, called the Patrind Hydropower Project, could not be more different than Amaila.The result is yet another example of the Opposition trying to use apples-to-oranges comparisons to purposely mislead the Guyanese people.Here are the simple facts, which had the Opposition members bothered to research, might have steered them away from making such a blatantly incorrect comparison:1)    The cost of a transmission line is not included in the Pakistan project cost.  For Amaila, this cost is approximately US$155 million2)    The cost of an access road is not included in the Pakistan project cost.  This cost is estimated at approximately US$30 million for Amaila3)    The Pakistan project’s cost is actually estimated at US$436 million and not US$362 million as presented by the Opposition members.  This is based on an UNFCC project design document dated December 17, 2012, “the capital cost required for the Patrind Hydropower Project is currently estimated at US$436 million or approximately US$2.9 million per MW installed capacity.”4)    The UNFCC’s Secretariat has conducted thorough research on the project as part of registering it under one of its clean energy development mechanisms5)    The project is “low tech” when compared to Amaila.  The Pakistani project uses simpler technology called run-of-river because of its natural conditions.  A run-of-river hydro project is cheaper to construct than a normal hydro because it does not require the significant civil-engineering works such as the construction of an underground power tunnel, which is a sizable portion of construction costs.  Amaila will have a three kilometer underground power tunnel from the reservoir to the turbines, whereas the physical conditions of the Pakistan project do not require such a tunnel.  The cost of constructing the Amaila power tunnel and shaft is approximately US$56million.6)    In addition, because the Pakistan project is a run-of-river project, it has a small reservoir—56 hectares vs. Amaila’s reservoir of 2,330 hectares—a metric that clearly shows the complete difference in hydro-dam type of the two projects and why they should not be compared.  We will not try to estimate the increased cost for clearing the larger reservoir, although this is obviously a factor for the cost comparison7)    The Pakistan project benefits from concessional financing.  According to the aforementioned UNFCC project design document, “the fact that the financing for such huge projects in Pakistan is difficult is evident as the multilateral banks (MLBs) are willing to consider the financing for the project below a competitive margin of 4.75 per cent… If same project would have to be financed based on local sponsors and no Certified Emission Reduction revenue, the MLBs would not have agreed on such terms given the risk profile of the country and local sponsors.”8)    Longevity – the power generating equipment of the Pakistan project is expected to last for 30 years.  Amaila’s equipment on the other hand is expected to last 50 years,Wholesale NFL Jerseys, and if well maintained with proper major maintenance overhauls, 75 to 100 years.  Obviously, longer lasting equipment will command a premium.Aside from taking into consideration the facts specific to the two projects, the Opposition members failed to, purposely or not,Budda Baker Jersey, reveal to their audience the large difference in the settings in which these two projects are being developed.  Pakistan currently has 21 hydropower plants that are providing energy to its national grid.As a result, Pakistan has extensive experience in building and operating hydros, giving that country certain advantages,China Stitched NFL Jerseys, such as in-country expertise, on-going relationships with hydro developers, etc.  In 2011, Pakistan had a total hydro installed capacity of 6,720 MW.Guyana on the other hand is in the process of developing its first hydro.  This is the first time Guyana is able to tap its large water resource to deliver power to its citizens.  However,NFL Jerseys Cheap, the Opposition seems to be pulling out all stops to try to prevent this,Dan Hampton Bears Jersey, even if it means distorting the facts and telling the public that they should continue to wait for hydropower by presenting false comparisons.It is terribly ironic that the Opposition is making a case for the Guyanese public to wait for hydro by presenting a misleading comparison to a hydro in Pakistan, a country which has had over 100 MW of installed hydro capacity since 1958.  The public cannot fall for that.
回復

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

重要聲明:本討論區是以即時上載留言的方式運作,A-Plus補習討論區對所有留言的真實性、完整性及立場等,不負任何法律責任。而一切留言之言論只代表留言者個人意見,並非本網站之立場,讀者及用戶不應信賴內容,並應自行判斷內容之真實性。於有關情形下,讀者及用戶應尋求專業意見(如涉及醫療、法律或投資等問題)。 由於本討論區受到「即時上載留言」運作方式所規限,故不能完全監察所有留言,若讀者及用戶發現有留言出現問題,請聯絡我們。A-Plus補習討論區有權刪除任何留言及拒絕任何人士上載留言(刪除前或不會作事先警告及通知),同時亦有不刪除留言的權利,如有任何爭議,管理員擁有最終的詮釋權。用戶切勿撰寫粗言穢語、誹謗、渲染色情暴力或人身攻擊的言論,敬請自律。本網站保留一切法律權利。

手機版|小黑屋|A-Plus互動討論區    

GMT+8, 2024-5-5 10:26 , Processed in 0.075142 second(s), 28 queries .

Powered by Discuz! X3

© 2001-2013 Comsenz Inc.

快速回復 返回頂部 返回列表