設為首頁收藏本站

A-Plus互動討論區

 找回密碼
 立即註冊

Login

免註冊即享有會員功能

搜索
熱搜: 活動 交友 discuz
查看: 15|回復: 0
打印 上一主題 下一主題

Cheap Jerseys China vpbonuc2

[複製鏈接]

1萬

主題

1萬

帖子

4萬

積分

論壇元老

Rank: 8Rank: 8

積分
45633
跳轉到指定樓層
樓主
發表於 2017-11-18 11:02:33 | 只看該作者 回帖獎勵 |倒序瀏覽 |閱讀模式
分享到: 更多
Some two months after the Haag Bosch Dumpsite was scheduled for opening, the Mayor and City Council is still waiting on a response from the Ministry of Local Government in relation to an interim dumpsite.The Haag Bosch site which is located at Eccles Industrial site was expected to phase out the existing Mandela dump site.Given the delay, the Mayor and City Council had penned a letter to the Ministry asking for a location to open an interim dumpsite since Mandela has out lived its capacity.Mayor of Georgetown,China Adidas Hockey Jerseys, Hamilton Green, said that they are now looking at using an old burial area in the Le Repentir Cemetery as an interim dumpsite.The Mayor explained that based on the response they have got from the contractors responsible for the Haag Bosch site, the site may be ready by January.Mayor Green explained that as a result the council is now looking at opening up an area in the eastern side of the Le Repentir.He however noted that an estimated $13M is needed to do minimal works for opening out the area. According to Mayor Green, the estimated $13 M will only provide for the construction of roads to gain access to the site.The Mayor said that they are still awaiting a response from the Ministry.Meanwhile, when this newspaper visited the Haag Bosch site yesterday works were ongoing.However, this newspaper was told that no one is permitted on the site to take photographs.The Haag Bosch location was selected with the help of the Inter-American Development Bank (IDB) in 2000, according Hubert Urlin, Director of Solid Waste, and work on the landfill site is ongoing. Construction at the new site is being done by BK International and Puran Brothers at the cost of some US$9.7 million.The contractors are tasked with constructing and operating the Haag Bosch site over a five to nine-year period. The site will be accessed by the Eccles Industrial Estate road and according to Urlin, measures will be taken to ensure that trucks taking garbage to the new site will be covered. He noted that the new site is a collection and treatment site.
回復

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

重要聲明:本討論區是以即時上載留言的方式運作,A-Plus補習討論區對所有留言的真實性、完整性及立場等,不負任何法律責任。而一切留言之言論只代表留言者個人意見,並非本網站之立場,讀者及用戶不應信賴內容,並應自行判斷內容之真實性。於有關情形下,讀者及用戶應尋求專業意見(如涉及醫療、法律或投資等問題)。 由於本討論區受到「即時上載留言」運作方式所規限,故不能完全監察所有留言,若讀者及用戶發現有留言出現問題,請聯絡我們。A-Plus補習討論區有權刪除任何留言及拒絕任何人士上載留言(刪除前或不會作事先警告及通知),同時亦有不刪除留言的權利,如有任何爭議,管理員擁有最終的詮釋權。用戶切勿撰寫粗言穢語、誹謗、渲染色情暴力或人身攻擊的言論,敬請自律。本網站保留一切法律權利。

手機版|小黑屋|A-Plus互動討論區    

GMT+8, 2024-5-23 23:42 , Processed in 0.070513 second(s), 26 queries .

Powered by Discuz! X3

© 2001-2013 Comsenz Inc.

快速回復 返回頂部 返回列表