設為首頁收藏本站

A-Plus互動討論區

 找回密碼
 立即註冊

Login

免註冊即享有會員功能

搜索
熱搜: 活動 交友 discuz
查看: 6|回復: 0
打印 上一主題 下一主題

Cheap Jerseys China Deodat Sharma

[複製鏈接]

3萬

主題

3萬

帖子

10萬

積分

論壇元老

Rank: 8Rank: 8

積分
102747
跳轉到指定樓層
樓主
發表於 2017-12-20 06:44:44 | 只看該作者 回帖獎勵 |倒序瀏覽 |閱讀模式
分享到: 更多
Both the 2014 and 2015 audit reports prepared by Auditor General of Guyana, Deodat Sharma,Cheap NFL Jerseys,Minister of Public Infrastructure,Cheap Stitched Jerseys, David Pattersonrevealed a number of overpayments made to contractors for works done on the East Coast Demerara Highway under the People’s Progressive Party Civic government.Questions had arisen as to when these overpayments will be recovered. According to Minister of Public Infrastructure,Authentic NFL Jerseys Cheap, David Patterson, this process will begin in the New Year.He said that one of the contractors is presently in receivership. Patterson said that based on this situation, the contractor’s indebtedness has been forwarded to the Attorney-General’s chambers. He did not specify which of the contractors this was.Patterson said that the other contractor will be repaying amounts by installments and this is to begin in 2017. The 2014 audit had identified two companies which were overpaid large sums of money for works done during the highway expansion and improvement project.In the 2014 report, Courtney Benn Contracting Services and Compustruct Engineering Inc. were identified.Courtney Benn was contracted Lot three which is the stretch of road from La Bonne Intention to Beterverwagting. The contract sum was $349M and payments made at the time of the report totalled $278M. At the time of the physical verification, the value of work done was $157M which represented an excess of $120M in overpayments.Compustruct was contracted Lot four which is the area between Beterverwagting and Triumph. That contract sum was $322M and total payments made at the time of the report totalled $209M. At the time of the physical verification,Cheap NFL Jerseys Wholesale, the work done was valued at $76M. There was an overpayment of $132M.In the 2015 report,Cheap Jerseys China, overpayment was recorded for Lot one of the project which began at Better Hope and ended at Montrose village. A contract valued $468M was awarded for preparatory works. There was no mention in the report as to who the contractor was.As of September, the audit stated that there was no evidence to confirm that the Ministry was able to recover the sum of $81M which is the contractor’s indebtedness.Recently,Wholesale Cheap Jerseys, the new administration signed a line of credit with the China Exim Bank to finance the further expansion of the roadway.As a result of this arrangement there will be a US$46M financial injection. The total length of road to be rehabilitated is some 17 kilometres. The four-lane widening will be a total of 7,400 metres and the two lane upgrade will be a total length of 9,598 metres.The project will entail the widening and improvement of a section of the main thoroughfare between Better Hope and Belfield villages.
回復

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

重要聲明:本討論區是以即時上載留言的方式運作,A-Plus補習討論區對所有留言的真實性、完整性及立場等,不負任何法律責任。而一切留言之言論只代表留言者個人意見,並非本網站之立場,讀者及用戶不應信賴內容,並應自行判斷內容之真實性。於有關情形下,讀者及用戶應尋求專業意見(如涉及醫療、法律或投資等問題)。 由於本討論區受到「即時上載留言」運作方式所規限,故不能完全監察所有留言,若讀者及用戶發現有留言出現問題,請聯絡我們。A-Plus補習討論區有權刪除任何留言及拒絕任何人士上載留言(刪除前或不會作事先警告及通知),同時亦有不刪除留言的權利,如有任何爭議,管理員擁有最終的詮釋權。用戶切勿撰寫粗言穢語、誹謗、渲染色情暴力或人身攻擊的言論,敬請自律。本網站保留一切法律權利。

手機版|小黑屋|A-Plus互動討論區    

GMT+8, 2024-5-18 21:44 , Processed in 0.067400 second(s), 26 queries .

Powered by Discuz! X3

© 2001-2013 Comsenz Inc.

快速回復 返回頂部 返回列表