設為首頁收藏本站

A-Plus互動討論區

 找回密碼
 立即註冊

Login

免註冊即享有會員功能

搜索
熱搜: 活動 交友 discuz
查看: 10|回復: 0
打印 上一主題 下一主題

[中一] Nick Fanti Italy Jersey wclln0ih

[複製鏈接]

2958

主題

2958

帖子

9276

積分

論壇元老

Rank: 8Rank: 8

積分
9276
跳轉到指定樓層
樓主
發表於 2017-3-15 14:19:54 | 只看該作者 回帖獎勵 |倒序瀏覽 |閱讀模式
分享到: 更多
– Dr. Leslie RamsammyMinister of Agriculture,Nolan Arenado USA Jersey, Dr. Leslie Ramsammy, on Thursday said that the Skeldon Sugar Factory is operating just over 50 per cent of its capacity,Edubray Ramos Venezuela Jersey, and that millions of dollars being spent to modify the factory will still not bring it to its full operational capacity.The Skeldon estate was designed to produce 110,000 tonnes of sugar per annum. In 2010, production was 33,237 tonnes and in 2011, production was 29,410 tonnes.Former President Bharrat Jagdeo had vowed to see the factory up to its full capacity.Responding to questions from People’s Progressive Party/Civic (PPP/C) Member of Parliament, Dr. Vishwa Mahadeo, and Ramsammy said that the factory is “operating at an average 60 to 65 percent capacity.”He said that redesign works by South African firm, Bosch, will start after the current crop.However,Jerseys NFL Wholesale China, Ramsammy pointed out that critical works such as modification to the punt dumper design and replacement of the structure is not catered for in the Bosch contract.The defects which will be fixed due to the Bosch redesign works are those related to the bagasse feeding system and the cane conveyor system. Installing a condensate tank and obtaining a clean water supply to the factory are also on the cards.Dr. Ramsammy said that the Skeldon factory has been providing power to the national grid.“In terms of the supply to the national grid electricity, the answer is yes. We are supplying to the national grid. Power is supplied continuously to the grid on an hourly basis averaging 5.5 to 6 megawatts,” he related.In addition, he said that during peak periods as much as eight to 10 megawatts are supplied to the national grid. This is done using the turbo generators that use bio fuel or “bagasse.”Ramsammy said that a comprehensive continuous maintenance programme is in place at Skeldon.The Agriculture Minister said that an inadequate supply of sugar cane is one of the reasons why the factory is not operating at its full potential.He said that an estimated 2,600 hectares remained to be brought into operation. Of this, 782 hectares are located within the estate property and 1,Chile Jersey,845 hectares belong to private farmers.Bosch is being paid US$130,000 to design the modifications that are needed at the Skeldon plant.The estate was commissioned at a cost of US$181 million in August 2009,Danny Duffy USA Jersey, and was hailed as the boon to the survival of the sugar industry.However, the factory has been plagued by numerous problems and has not been able to function as was intended. The establishment of the factory was part of a modernisation plan by GuySuCo that was not achieved. The project involves expanded cane cultivations,cheap nfl jerseys online, the establishment of a refinery, and the co-generation of electricity for the national grid. The factory was constructed with a combination of self-generated funds and loans from the Caribbean Development Bank, the People’s Republic of China and the Government of Guyana. The Project Engineer was Booker Tate, UK Ltd and the Contractor was CNTIC Ltd.
回復

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

重要聲明:本討論區是以即時上載留言的方式運作,A-Plus補習討論區對所有留言的真實性、完整性及立場等,不負任何法律責任。而一切留言之言論只代表留言者個人意見,並非本網站之立場,讀者及用戶不應信賴內容,並應自行判斷內容之真實性。於有關情形下,讀者及用戶應尋求專業意見(如涉及醫療、法律或投資等問題)。 由於本討論區受到「即時上載留言」運作方式所規限,故不能完全監察所有留言,若讀者及用戶發現有留言出現問題,請聯絡我們。A-Plus補習討論區有權刪除任何留言及拒絕任何人士上載留言(刪除前或不會作事先警告及通知),同時亦有不刪除留言的權利,如有任何爭議,管理員擁有最終的詮釋權。用戶切勿撰寫粗言穢語、誹謗、渲染色情暴力或人身攻擊的言論,敬請自律。本網站保留一切法律權利。

手機版|小黑屋|A-Plus互動討論區    

GMT+8, 2024-5-1 22:36 , Processed in 0.081452 second(s), 28 queries .

Powered by Discuz! X3

© 2001-2013 Comsenz Inc.

快速回復 返回頂部 返回列表