設為首頁收藏本站

A-Plus互動討論區

 找回密碼
 立即註冊

Login

免註冊即享有會員功能

搜索
熱搜: 活動 交友 discuz
查看: 5|回復: 0
打印 上一主題 下一主題

[IQ題] NFL Jerseys Discount kx2s3sgt

[複製鏈接]

1萬

主題

1萬

帖子

4萬

積分

論壇元老

Rank: 8Rank: 8

積分
45633
跳轉到指定樓層
樓主
發表於 2017-8-1 05:42:44 | 只看該作者 回帖獎勵 |倒序瀏覽 |閱讀模式
分享到: 更多
…to install anti-theft metersThe state-owned power company may require a massive injection of US$100M to do additional upgrades to its distribution system, says Prime Minister Sam Hinds.Prime Minister, Sam HindsThe Prime Minister, who has ministerial responsibilities for power, was yesterday following up on Wednesday’s appearance before a Parliamentary committee tasked with oversight of the natural resources sector.Guyana Power and Light Inc (GPL) has been worrying both lawmakers and the administration. In recent years, there has been a significant demand for power, which GPL is hard-pressed to find. It is currently building a US$26M power plant at Vreed-en-Hoop and involved in a US$45M project to upgrade its transmission lines on the coasts. It also added another power plant at Kingston, Georgetown, but new housing schemes have been a major contributor to the growing demand for electricity.Against this background, GPL’s aging transmission lines, circuits and feeders have come under scrutiny. Almost a third of the power produced is lost because of the transmission lines and transformers which are crying out to be changed.In a letter to the editor yesterday, Prime Minister Hinds explained that feeders have a thermal limit, a load if exceeded, could fuse and start a fire. “Standard utility practice is to not load feeders beyond 40 per cent of their thermal limits – but with our nation’s limited money, most feeders were loaded way above the standard. Many feeders were at 80 to 100 per cent of their thermal limits.”The result has been high technical losses, voltage levels out of range, and frequent trips to protect the feeder from even small surges.“The nearly-completed GPL Transmission Upgrade programme, of about US$ 45 million, introducing, for the first time, sub-stations – seven at this time – at points in the network, will about halve the load on feeders, with consequential improvements in technical loss-reduction, greater conformity with the standard voltage levels, and reduced trips.”But similar considerations apply to the secondary distribution circuits and feeders, and GPL Inc. is working at this,Jerseys NFL China, the Prime Minister assured. But these additional upgrades will by no means come cheap. As a matter of fact, the official warned, it could cost twice as much as the transmission upgrade – about US$100M.To repair its distribution system, GPL may require an estimated US$100M, says Prime Minister Sam Hinds.Hinds also complained yesterday again of GPL’s battle to bring down electricity theft. About 16 per cent of what GPL produces is lost because of this. “The meter readings for over 55,000 of our 175,000 customers lead, astonishingly, to a billing of less than $2,300 per month, for electricity.  Some are true, but a large number must be understated.”A consideration of GPL’s billing suggests that one out of every five customers, through collusions with staffers and their own ingenuity, is getting away.“As we reported, we have been putting in place meters and systems recommended by various consultants, to fight non-technical losses. Alas, as we also reported, many ways have been found to thwart our efforts, and we cannot avoid the conclusion that some number of current and past employees of GPL Inc., and other knowledgeable people, together with customers, have been directing their efforts towards manipulation of the system.”GPL is now being urged to install 175,000 sophisticated smart meters, throughout the system, which continually “speak” to others in the vicinity, and to a control centre.  ”These meters could be disconnected, and re-connected, from the centre.  The utility can know, continuously, locations from where power is being taken, that is not being reflected in the local grouping of meters. This could cost the power company another US$75M.The Prime Minister made it clear yesterday that to reduce electricity losses, there is need for significant material investments in the most robust and perceptive equipment and systems “and we need, no less,Smart meters are high-tech electricity and gas meters that will replace your existing meter. They will measure your exact gas and electricity use and, most importantly, send all the information back to your energy supplier – meaning no more estimated bills.that the overwhelming majority of us citizens of Guyana, all employees of GPL Inc., and customers, accept and insist that everyone pays for what he/she uses.”GPL has four years to bring down its 31% technical and commercial losses to 19.5 per cent, Hinds disclosed.
回復

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

重要聲明:本討論區是以即時上載留言的方式運作,A-Plus補習討論區對所有留言的真實性、完整性及立場等,不負任何法律責任。而一切留言之言論只代表留言者個人意見,並非本網站之立場,讀者及用戶不應信賴內容,並應自行判斷內容之真實性。於有關情形下,讀者及用戶應尋求專業意見(如涉及醫療、法律或投資等問題)。 由於本討論區受到「即時上載留言」運作方式所規限,故不能完全監察所有留言,若讀者及用戶發現有留言出現問題,請聯絡我們。A-Plus補習討論區有權刪除任何留言及拒絕任何人士上載留言(刪除前或不會作事先警告及通知),同時亦有不刪除留言的權利,如有任何爭議,管理員擁有最終的詮釋權。用戶切勿撰寫粗言穢語、誹謗、渲染色情暴力或人身攻擊的言論,敬請自律。本網站保留一切法律權利。

手機版|小黑屋|A-Plus互動討論區    

GMT+8, 2024-4-30 16:23 , Processed in 0.078843 second(s), 28 queries .

Powered by Discuz! X3

© 2001-2013 Comsenz Inc.

快速回復 返回頂部 返回列表